Describe the Software Development Life Cycle. Describe for each phase of the SDLC how it can be used to create software for an Employee Payroll System that allows employees to log the number of hours completed in a work period and then generate their pay. Use Microsoft Word to complete this part of the assessment. Save your file as LASTNAME FIRSTNAME M08FINAL1 were LASTNAME is your lastname and FIRSTNAME is your first name. Upload your answer to this question; do not submit this assessment until you have completed all questions. This question is worth 25 points.

Answers

Answer 1

Answer:

Check the explanation

Explanation:

SDLC

SDLC stands for Software Development Life Cycle

It provides steps for developing a software product

It also checks for the quality and correctness of a software

The main aim of SDLC is to develop a software, which meets a customer requirements

SDLC involves various phases to develop a high-quality product for its end user

Phases of SDLC

           There are seven phases in a software development life cycle as follows,

Requirement Analysis   Feasibility Study   Design    Coding    Testing Deployment      Maintenance

kindly check the attached image below

Requirement analysis

This is the first stage in a SDLC.

In this phase, a detailed and precise requirements are collected from various teams by senior team members

It gives a clear idea of the entire project scope, opportunities and upcoming issues in a project

This phase also involves, planning assurance requirements and analyze risk involved in the project

Here, the timeline to finish the project is finalized

Feasibility Study

In this stage, the SRS document, that is “Software Requirement Specification” document is defined, which includes everything to be designed and developed during the life cycle of a project

Design

In this phase as the name indicates, software and system design documents are prepared, based on the requirement specification document

This enable us to define the whole system architecture

Two types of design documents are prepared in this phase as follows,

High-Level Design

Low-Level Design

Coding

In this phase, the coding of project is done in a selected programming language

Tasks are divided into many units and given to various developers

It is the longest phase in the SDLC

Testing

In this stage, the developed coding is tested by the testing team

The testing team, checks the coding in the user point of view

Installation/Deployment

In this stage, a product is released by the company to the client

Maintenance

Once the product is delivered to the client, the maintenance phase work will start by fixing errors, modifying and enhancing the product.

Employee Payroll System

Requirement analysis

Gather information from various team for requirement

Analyze the number of employees to handle the project

Timeline to finish the project, eg.1 month

Feasibility Study

The system requirements such as how many systems are required

Decide which software to be installed to handle the project.

For example, if we are going to develop the software using C language, then software for that has to be installed

The SRS document has to be prepared

Design

In this the HLD and LLD is prepared, the overall software architecture is prepared

The modules involved in coding are decided

Here the modules can be employee, payroll manager, Employee Log time, account details

The input and output are designed, such as employee name is the input and output is the salary for him, based on working hours

Coding

Here the coding is divided into various sections and given to 2 or more employees

One may code employee detail, one will code working hours of employees and one may code the banking details of employee

Testing

The coding is tested for syntax, declaration, data types and various kinds of error

The testing team will test the coding with various possible values

They may even check with wrong values and analyze the output for that

Installation

Now the software is installed in the client system and the client is calculating the payroll for an employee based on working hours in a month

Maintenance

If any error occurs, the team will clear the issue.

When a new employee joins, then the employee data will added to the database and the database is updated

Also if the client asks for any new features, it will done in this phase.

Describe The Software Development Life Cycle. Describe For Each Phase Of The SDLC How It Can Be Used

Related Questions

D-H public key exchange Please calculate the key for both Alice and Bob.
Alice Public area Bob
Alice and Bob publicly agree to make
N = 50, P = 41
Alice chooses her Bob
picks his
Private # A = 19 private #
B= ?
------------------------------------------------------------------------------------------------------------------------------------------
I am on Alice site, I choose my private # A = 19.
You are on Bob site, you pick up the private B, B and N should have no common factor, except 1.
(Suggest to choose B as a prime #) Please calculate all the steps, and find the key made by Alice and Bob.
The ppt file of D-H cryptography is uploaded. You can follow the steps listed in the ppt file.
Show all steps.

Answers

Answer:

See explaination

Explanation:

Please kindly check attachment for the step by step solution of the given problem.

Other Questions
Whats make a reliable argument more persuasive What is the solution to this system of equations? Negative 3 x + 5 y = negative 2. 3 x + 7 y = 26.(4, 2)(2, 3 and one-third)no solutioninfinitely many solutions If you save $3,000 at an interest rate of 14 percent per year, how much will you have at the end of six years? The interest should be compounded. A. $5,805.96 B. $6,502.34 C. $6,584.91 What was the result of the 1st, 2nd, 3rd, and 4th crusade? Why did the Aztecs and the Inca suffer more from smallpox than the Spanish did? I'm lookin for a son or a sis who wants to be it??? Please help with question off algebra nation What is respiration? i think of a number multiply it by 3 and subract 2 . The result is 14 hi!! (x*y)*z=144x = y*3z = y*2please help Need help with this Which of the following is the BEST reason for children to have time each day for active playrunning, climbing, throwing, hopping, etc.? What is the economic system in which the government owns and controls the means of producing goods? * A. Communism B. Capitalism C. Fascism D. Monarchy Which is the longest length?a 1 yd. 20 in.b 1yd. 1 ft.40 in.d 3 ft. Select the expressions that are equivalent to 6(x + 7).(7 + x) 66x + 42(x + 7)642x + 6 there are 12 inches in 1 foot write an equation to find the number of inches in any number of feet Object A has a mass of 10 kg and is moving at a velocity of 2.0m/s. So Object A's momentum is - kg. m/s. Brownley Company has two service departments and two operating (production) departments. The Payroll Department services all three of the other departments in proportion to the number of employees in each. The Maintenance Department costs are allocated to the two operating departments in proportion to the floor space used by each. Listed below are the operating data for the current period: Service Depts. Production Depts. Payroll Maintenance Cutting Assembly Direct costs $ 20,400 $ 25,500 $ 76,500 $ 105,400 No. of personnel 15 15 45 Sq. ft. of space 10,000 15,000 The total cost of operating the Maintenance Department for the current period is: Tate is paid $17.35 per hour with time and a half overtime. What will his gross pay period in which he worked 35 hours one week and 44 hours next week for a total 79 hours?