Explain why the probability that the critical path will be finished in 22 weeks or less is not necessarily the probability that the project will be finished in 22 weeks orless.

Answers

Answer 1

Answer:

The question is very not detailed but I assume that because the path will finish does not mean that the whole thing/project will finish.

Step-by-step explanation:


Related Questions

What is the answer of this question?

Answers

Answer:

2 ( Option A )

Step-by-step explanation:

The given integral to us is ,

[tex]\longrightarrow \displaystyle \int_0^1 5x \sqrt{x}\ dx [/tex]

Here 5 is a constant so it can come out . So that,

[tex]\longrightarrow \displaystyle I = 5 \int_0^1 x \sqrt{x}\ dx [/tex]

Now we can write √x as ,

[tex]\longrightarrow I = \displaystyle 5 \int_0^1 x . x^{\frac{1}{2}} \ dx [/tex]

Simplify ,

[tex]\longrightarrow I = 5 \displaystyle \int_0^1 x^{\frac{3}{2}}\ dx [/tex]

By Power rule , the integral of x^3/2 wrt x is , 2/5x^5/2 . Therefore ,

[tex]\longrightarrow I = 5 \bigg( \dfrac{2}{5} x^{\frac{5}{2}} \bigg] ^1_0 \bigg) [/tex]

On simplifying we will get ,

[tex]\longrightarrow \underline{\underline{ I = 2 }}[/tex]

Express each of the following negative angles as its equivalent positive angle between 0°and360°
+120°

Answers

Answer:

Dilated pupils

Long periods of wakefulness

Loss of appetite

Overconfidence

Over-excitement

Paranoia

Runny nose or frequent sniffles

White powder around nostrils

Legal issues

Missing or being late to work

Financial problems

Mood swings

Irritability

Depression

what is the solution to 4 1/5 x (1 1/9 x 3)

Answers

Answer:

14

Step-by-step explanation:

[tex]4 \frac{1}{5} \times (1 \frac{1}{9} \times 3) \\\\= \frac{21}{5} \times ( \frac{10}{9} \times 3)\\\\=\frac{21}{5} \times( \frac{10}{3})\\\\= \frac{21 \times 10}{ 5 \times 3}\\\\=7 \times 2 \\\\= 14[/tex]

Consider the quadratic function f(x) = x2 - 5x + 6.
What are the values of the coefficients and constant in the function?
а
b
c

Answers

Answer:

a=1

b=-5

c=6

Step-by-step explanation:

ax^2+bx+c=0

Is the formula used for this question.

The given function is the same as y = 1x^2 + (-5x) + 6

Compare it to the form y = ax^2+bx+c, and we have the following:

a = 1

b = -5

c = 6

solve the logarithmic equation
[tex] log_{6}(2x - 6) + log_{6}x = 2[/tex]

Answers

Answer:

[tex]x=6[/tex]

Step-by-step explanation:

We want to solve the equation:

[tex]\displaystyle \log_6(2x-6)+\log_6x=2[/tex]

Recall the property:

[tex]\displaystyle \log_bx+\log_by=\log_b(xy)[/tex]

Hence:

[tex]\log_6(x(2x-6))=2[/tex]

Next, recall that by the definition of logarithms:

[tex]\displaystyle \log_b(a)=c\text{ if and only if } b^c=a[/tex]

Therefore:

[tex]6^2=x(2x-6)[/tex]

Solve for x. Simplify and distribute:

[tex]36=2x^2-6x[/tex]

We can divide both sides by two:

[tex]x^2-3x=18[/tex]

Subtract 18 from both sides:

[tex]x^2-3x-18=0[/tex]

Factor:

[tex](x-6)(x+3)=0[/tex]

Zero Product Property:

[tex]x-6=0\text{ or } x+3=0[/tex]

Solve for each case. Hence:

[tex]x=6\text{ or } x=-3[/tex]

Next, we must check the solutions for extraneous solutions. To do so, we can simply substitute the solutions back into the original equations and examine its validity.

Checking x = 6:

[tex]\displaystyle \begin{aligned} \log_{6}(2(6)-6)+\log_{6}6&\stackrel{?}{=} 2 \\ \\ \log_6(12-6)+(1)&\stackrel{?}{=}2 \\ \\ \log_6(6)+1&\stackrel{?}{=}2 \\ \\ 1+1=2&\stackrel{\checkmark}{=}2\end{aligned}[/tex]

Hence, x = 6 is indeed a solution.

Checking x = -3:

[tex]\displaystyle\begin{aligned} \log_6(2(-3)-6) + \underbrace{\log_6-3}_{\text{und.}} &\stackrel{?}{=} 2\\ \\ \end{aligned}[/tex]

Since the second term is undefined, x = -3 is not a solution.

Therefore, our only solution is x = 6.

Answer:

x = 6

Step-by-step explanation:

The given logarithmic equation is ,

[tex]\implies log_{6}(2x - 6) + log_{6}x = 2[/tex]

We can notice that the bases of both logarithm is same . So we can use a property of log as ,

[tex]\bf \to log_a b + log_a c = log_a {( ac)} [/tex]

So we can simplify the LHS and write it as ,

[tex]\implies log_{6} \{ x ( 2x - 6 )\} = 2 [/tex]

Now simplify out x(2x - 6 ) . We get ,

[tex]\implies log_6 ( 2x^2 - 6x ) = 2 [/tex]

Again , we know that ,

[tex]\bf \to log_a b = c , a^c = b [/tex]

Using this we have ,

[tex]\implies 2x^2 - 6x = 6^2 \\\\\implies 2x^2 - 6x -36 = 0 [/tex]

Now simplify the quadratic equation ,

[tex]\implies x^2 - 3x - 18 = 0 \\\\\implies x^2 -6x + 3x -18=0\\\\\implies x( x -6) +3( x - 6 ) = 0 \\\\\implies (x-6)(x+3) = 0 \\\\\implies x = 6 , -3 [/tex]

Since logarithms are not defined for negative numbers or zero , therefore ,

[tex]\implies 2x - 6 > 0 \\\\\implies x > 3 [/tex]

Therefore the equation is not defined at x = -3 . Hence the possible value of x is 6 .

[tex]\implies \underline{\underline{ x \quad = \quad 6 }}[/tex]

Solve for x. Round to the nearest tenth, if necessary.

Answers

Answer:

x = 63.9

Step-by-step explanation:

We have:

[tex]\frac{QR}{sin35}[/tex] = [tex]\frac{78}{sin90}[/tex]

=> QR × sin90 = 78 × sin35

=> QR × sin90 = 44.7

=> QR = 44.7

But, we also have: [tex]x^{2}[/tex] + [tex]QR^{2}[/tex] = [tex]78^{2}[/tex] <=> [tex]x^{2}[/tex] + [tex]44.7^{2}[/tex] = [tex]78^{2}[/tex] <=> [tex]x^{2}[/tex] = 6084 - 1998.09

=> [tex]x^{2}[/tex] = 4085.91

=> x = [tex]\sqrt{4085.91}[/tex] = 63.9211.. = 63.9

<3 Have a nice day!!

The interior angle of a polygon is 3degrees greater than the exterior angle.find the sum of the angles of the polygon​

Answers

Step-by-step explanation:

We know that the sum of angle around a point is 180° . Therefore let the first angle be x then second will be x + 3 .

According to the Question ,

> x + x + 3 = 360°

> 2x = 357=

> x = 357°/2

> x = 178.5°

the lines given by the equations y=6x and y=6x+2 are ____

Answers

They are parallel, as shown by the graph.

pLZ HELPPPPPPPPPPPPPPPPPPPPPPPPP.

Answers

Answer:

x^4+4x^3+6x^2+7x+2

The 9th term of an arithmetic progression is 3+3p and the sum of the first four terms is 2p-10, where p is constant. Given that the common difference is 2, find the value of p.​

Answers

Answer:

3

Step-by-step explanation:

Let's find the first term in terms of p.

So an arithmetic sequence is a linear relation.

That means it will have the same slope no matter the pair of points used. We are given the slope, the common difference, is 2. We are going to use point (9, 3+3p) and (1, t(1)) along with m=2 to find t(1).

[t(1)-(3+3p)]/[1-9]=2

Simplify denominator

[t(1)-(3+3p)]/[-8]=2

Multiply both sides by -8

t(1)-(3+3p)=-16

Add (3+3p) on both sides

t(1)=-16+3+3p

Combine like terms

t(1)=-13+3p

This means we can find the next term by adding 2 this.

t(2)=-11+3p

Let's find the next term by adding 2 this.

t(3)=-9+3p

Finally we can find the 4th term by adding 2 to this

t(4)=-7+3p

We are given the sum of the first 4 terms is 2p-10. So we can write:

-13+3p+-11+3p+-9+3p+-7+3p=2p-10

Combine like terms on left

12p-40=2p-10

Subtract 2p on both sides

10p-40=-10

Add 40 on both sides

10p=30

Divide both sides by 10

p=3.

-----------------

Checking:

t(1)=-13+3p=-13+3(3)=-13+9=-4

t(2)=-11+3p=-11+3(3)=-11+9=-2

t(3)=-9+3p=-9+3(3)=-9+9=0

t(4)=-7+3p=-7+3(3)=-7+9=2

----sum of the first 4 is -4

And 2p-10 at p=3 gives 2(3)-10=6-10=-4

So this part checks out

In general, the pattern that those 4 terms I wrote out follow t(n)=(-13-2)+2n+3p. I know this because the 0th term would have been (-13-2)+3p and this part goes up by 2 each time. The plus 3p part doesn't change.

Anyways t(9)=(-13-2)+2(9)+3p=-15+18+3p=3+3p. And this part looks good too.

What are the zeros of the polynomial function f(x) = x(x + 5)(x – 8)?


–5, 8


0, –5, 8


5, –8


0, 5, –8

Answers

Answer:

Option B is answer.

Step-by-step explanation:

Hey there!

Given;

f(X) = X(X+5)(x-8)

According to the factor theorem, f(X) = 0;

Or, X(X+5)(x-8) = 0

Either;

x = 0

Or;

(x+5)= 0

X = -5

Or;

(x-8)= 0

x = 8.

Therefore, the zeros of the polynomial are: 0,-5,8.

Hope it helps!

solve the equation x + 5 = 12

Answers

Answer:

x = 7

Step-by-step explanation:

x + 5 = 12

Subtract 5 from both sides

5 - 5 cancels out

12 - 5 = 7

We're left with x = 7

Which number line model represents the expression -2+(-7)

Answers

Answer:

B

Step-by-step explanation:

Start at zero.

Go 2 units left to -2.

Then go another 7 units left to add -7.

Answer: B

Solve the following equa
8 (2v + 8) = 96
оа
v = 2
ii need help

Answers

Answer:

1

Step-by-step explanation:

64+32 =96 that'd how I got the answer

Answer:

[tex]{ \tt{8(2v + 8) = 96}} \\ { \tt{2v + 8 = 12}} \\ { \tt{2v = 4}} \\ { \bf{v = 2}}[/tex]

Mark had 3/2 cans of paint and used 1/2 cans for his room. What fraction of the paint did he use

Help I’m slowww

Answers

Answer:

1/3 fraction of whole paint is used by mark

Step-by-step explanation:

Mark used  1/2 out of 3/2 cans.

[tex]\frac{1}{2}[/tex] ÷ [tex]\frac{3}{2} = \frac{1}{2}*\frac{2}{3}=\frac{1}{3}[/tex]

Someone tell me where everyone is going right please !!

Answers

Answer:

1min = 0.25miles

5.25miles / 0.25miles = 25 = 25minutes

Step-by-step explanation:

Hope this is right I'm not the best at worded time/distance math questions.

9514 1404 393

Answer:

  0 ≤ t < 52.5 minutes

Step-by-step explanation:

Riko will be behind Yuto until her distance traveled matches his. That is, she will be behind for ...

  0.35t < 5.25 +0.25t

  0.10t < 5.25

  t < 52.5

Riko will be behind Yuto on the interval 0 ≤ t < 52.5 minutes.

_____

Additional comment

distance = speed × time

Here, time is measured from when Riko starts riding. In addition to the 5.25 miles that Yuto has already gone, his distance will be the product of his speed (0.25 mi/min) and the travel time (t min). Then Yuto's total distance is 5.25+0.25t miles. The speed×time product is also used to find Riko's distance traveled. In her case, it is 0.35t miles.

given circle o, what are the values of x and y?

Answers

Answer:

x = 38°

y = 90°

Step-by-step explanation:

x is an inscribed angle, so, 78/2=39

y is an inscribed angle of which connects two endpoints of the diameter, so y = 90°

Answered by GAUTHMATH

I do not understand any of this

Answers

Answer:

to get the slope. take the change of y axis value divide by the change of x axis value

P=(2,3,5,7) Express it in description method and in rule method.​

Answers

Answer:

prime number between 1 to7

The description of set P is the set of prime numbers less than or equal to 7 and the rule is {x | x is a prime number less than or equal to 7}

How to describe the set of P?

The set P is given as:

P = {2,3,5,7}

Note that the numbers are prime numbers.

This means that the description of set P is the set of prime numbers less than or equal to 7

The rule form of the set would be:

P = {x | x is a prime number less than or equal to 7}

Read more about sets at:

https://brainly.com/question/1563195

#SPJ2

Find the TWO integers whos product is -12 and whose sum is 1
m​

Answers

Answer:

[tex] \rm Numbers = 4 \ and \ -3.[/tex]

Step-by-step explanation:

Given :-

The sum of two numbers is 1 .

The product of the nos . is 12 .

And we need to find out the numbers. So let us take ,

First number be x

Second number be 1-x .

According to first condition :-

[tex]\rm\implies 1st \ number * 2nd \ number= -12\\\\\rm\implies x(1-x)=-12\\\\\rm\implies x - x^2=-12\\\\\rm\implies x^2-x-12=0\\\\\rm\implies x^2-4x+3x-12=0\\\\\rm\implies x(x-4)+3(x-4)=0\\\\\rm\implies (x-4)(x+3)=0\\\\\rm\implies\boxed{\red{\rm x = 4 , -3 }}[/tex]

Hence the numbers are 4 and -3.

Answer:

-3,4 are the TWO integers whos product is -12 and whose sum is 1.

Step-by-step explanation:

-3×4=12

-3+4=1

Help me with this problem

Answers

Answer:

The answer is 180 - 65

Step-by-step explanation:

We got 180, because that is the number of degree's in a line

so 180 - 65 is 115 degrees, that's your answer :)

Using trial and improvement, find the solution between 5 and 6 for the following equation:

x

2

=

27

Give your answer rounded to 1 DP.

Answers

Answer:

2

Step-by-step explanation:

that is √ 14 which is 27 ×>44.2177

A u B u C A=(a,b,c,d,e) B=(d,e,f,g,h,i) C=(a,e,i,o,u) help class 8​

Answers

Answer:

If U = { a, b, c, d, e, f, g, h} , find the complements of the following sets:(i) A = {a, b, c} (ii) B = {d, e, f, g} (iii) C = {a, c, e, g} (iv) D = { f, g, h, a}

Answer:

if;

A= { a,b,c,d,e}

B= {d,e,f,g,h,i}

C= {a,e,i,o,u}

AuBuC = {a,b,c,d,e,f,g,h,i,o,u}

HAVE A NİCE DAY

Step-by-step explanation:

GREETİNGS FROM TURKEY ¯ツ

6. Don Juan compro un terreno con las dimensiones que se muestran en la figura el cual se va acondicionar para realizar eventos sociales, por lo que desea instalar césped en la region sombreada. ¿Cuantos metros cuadrados de césped requiere? Considera rt=3.14 16 m O 50 24 m2 0 205 76 m2 256 00 m2 0 5504 m2​

Answers

Answer:

Not sure but I think it might be A

Step-by-step explanation:

Took the test

factor completely 8y2 + 6y + 1

Answers

Answer:

Step-by-step explanation:

8y²+6y+1

=8y²+4y+2y+1

=4y(2y+1)+1(2y+1)

=(2y+1)(8y+1)

I did 70 jumping jacks in 1 minute.

Which is the dependent variable? Which is the independent variable?

Write an equation that represents the relationship between the time you spent doing the activity and the amount of the activity you completed.

Answers

Answer:

in jh ynhtym

hunt ghb JBL iggmmjuu ki ju nu j

1. Write down the gradient of the line joining the points (2m, n) and (3, -4).
2.Find the value of n if the line is parallel to the X-axis
3.Find the value of m if the line is parallel to the Y-axis.

Answers

Answer:

Step-by-step explanation:

1 . ( n + 4 ) / ( 2m - 3 )

The gradient (slope) is

= ( change in y direction ) / ( change in x direction )

= ( n - (-4) ) / ( 2m - 3 )

= ( n + 4 ) / ( 2m - 3 )

2.

A line parallel to the x-axis will always have the equation of y = #. This is because all along that line, every value of x, y will still equal the same number. For example, a line parallel to the x-axis that crosses the y-axis at 2, will be y = 2. If it is in the negative range, it's the same concept, for example if it crossed the y-axis at -4, the equation would be y = -4.

Example - Computational Knowledge Engine

3.

To understand the slope of a line parallel to y axis, let us consider the figure given below.

1 . The gradient (slope) is ( n + 4 ) / ( 2m - 3 )

2. n = -4

3. m is not defined.

What is Slope?

A line's slope is determined by how its y coordinate changes in relation to how its x coordinate changes. y and x are the net changes in the y and x coordinates, respectively. Therefore, it is possible to write the

change in y coordinate with respect to the change in x coordinate as,

m = Δy/Δx where, m is the slope

Given:

points (2m, n) and (3, -4).

1 . The gradient (slope) is

= ( change in y direction ) / ( change in x direction )

= ( n - (-4) ) / ( 2m - 3 )

= ( n + 4 ) / ( 2m - 3 )

2. A line parallel to the x-axis will always have the equation of y = x.

The line is therefore horizontal so gradient = 0

(n+4) / (2m-3)= 0

n = -4

(iii) Find the value of m if the line is parallel to the y-axis

(n+4) / (2m-3)= gradient

(n+4) / (2m-3)= 1

We know n = -4 from part (ii) then

(-4+4) /(2m-3)= 1

0/(2m-3) = 1

0 = 1 The 'm' vanishes

Hence, m is not defined.

Learn more about slope here:

https://brainly.com/question/3605446

#SPJ2

The number 6 is a solution to which of the following inequalities?
X - 13 > 7
6x < -12
6x > 32
21 + x < 28

Answers

Answer

6x<-12

Step-by-step explanation:

Answer:

There would be 2 answers in this case:

C. 6x > 32

and

D. 21 + x < 28

Step-by-step explanation:

A. Incorrect

6-13 = -7, and -7 is NOT greater than 7

B. Incorrect

6(6) = 36, and 36 is NOT less than -12.

C. Correct

6*6 = 36, which is greater than 32.

D. Correct

21+6 = 27, which is less than 28.

Marc puts 28 liters of water into a tub and 6 liters of water into a bucket. Then, he pours both containers into a tank.

Answers

What is the question asking for?

Answer:

34

Step-by-step explanation:

How much would $500 invested at 5% interest compounded continuously be worth after 4 years? Round your answer to the nearest cent

Answers

Answer:

$610.70

Step-by-step explanation:

[tex]a = pe^{rt}[/tex]

a = 500 [tex]e^{.05 * 4}[/tex]

a = $610.70

Other Questions
I need help with mathPlease Jillian can't bear to leave her home without washing all the linens and floors, vacuuming the carpets, and organizing everything in her cupboards. Because she knows that her behavior is extreme, she has tried to go to work without doing all these things, but she is overcome with such overwhelming discomfort that she never makes it all the way to the office. Jillian probably has You work as an assistant to a carpenter who designed the tabletop below. He tells you that each shape is a right triangle, and each is the same size. You now need to calculate the area of one triangle so that you can begin building the tabletop. What is the area of each triangle in square inches? 28 1/4" and 20" The instrument developed for use in the bisected-angle technique istheA) collimator.O B) PID.C) XCP instrument.D) BAI If any type of rock experiences intense heat and pressure, it changes into __________ rock. Which behavior would best describe someone who has good communication skills with customers ? a) Following up with some customers b) Talking to customers more than listening to them c) Repeating back what the customer says d) Interrupting customers frequently Question choices:A: I, IVB: II, III, IVC: III, IVD: II, III Vitamin C is a water-soluble vitamin, so your body doesn't store it. You have to get the required amount from your diet (citrus fruits are a great source!), or you could take a daily vitamin C supplement pill. Vitamin C is ascorbic acid, so to determine how much vitamin C (acid) has been placed in each pill, you could do an acid-base titration. One vitamin C pill was dissolved in water and titrated to an endpoint by 16.00 mL of a 0.447 M solution of NaOH. How many grams of ascorbic acid were there in the pill? (MW of ascorbic acid is 176.1 /mol). Explain and show your work. a report conclusion on waste management Lee la siguiente expresin del cuento: El suicidio de la Seora Stevens me preocupaba no policialmente, sino deportivamente....... (como juego, hazaa). Esta frase se relaciona con las caractersticas del policial clsico o con las del policial negro?. Fundamenta. order of operations. please help! Select the best answer for the ques12. A business has a goal of communicating frequently with its customers to offer specials and increase sales. What element should it consider adding to its websiteO A. DatabaseO B. Payment systemO C. CalendarO D. Mailing list opt-in Elbert uses FedEx in a scheme to defraud Global Sales Company by obtaining merchandise to which he is not entitled. Found guilty of mail fraud, Elbert can be punished by Working in the middle colonies was attractive because European immigrants A 9-pack of golf balls costs $8.74. What is the unit price, rounded to the nearest cent?per golf ball what is cell and atom ?any one online bore h o rahi hu Which best describes the relationship between the lines with equations 7x + 2y = 3 and-6x + 3y = 2? Y and x have a proportional relationship, and y=4 when x=12 A list of financial statement items for Oriole Company includes the following: accounts receivable $17,500; prepaid insurance $3,250; cash $13,000; supplies $4,750; and debt investments (short-term) $10,250. Required:Prepare the current assets section of the balance sheet listing the items in the proper sequence. Suppose a professional baseball player hit 55 home runs his first season, 58 his second,and 69 his third. How many home runs would he need to hit in the current season so thathis average for the 4 years is no less than 59?