Answer:
if the other person answers give it to them :)
Which rectangular prism has a volume equal to the impression 6 * 3 * 4
Answer:
6
Step-by-step explanation:
Answer:
Step-by-step explanation:
The prism will have
L=6, W=3 and H=4
not sure about the question, it is a rectangular prism,
it cant be a cube
Find an equation for the perpendicular bisector of the line segment whose end points are (-9,-8) and (3,-2)
Answer:
[tex]y=-2x-11[/tex]
Step-by-step explanation:
Slope of the line segment = [(-8)-(-2)]/[(-9)-3]=-6/-12=1/2
Slope of the perpendicular bisector x slope of line segment = -1
Slope of perpendicular bisector = -2
Mid-point of line segment = ((-9+3)/2, (-8+(-2))/2) = (-3, -5)
The perpendicular bisector passes through the mid-point.
By point-slope form,
[tex]\frac{y-(-5)}{x-(-3)} = -2\\y+5=-2x-6\\y=-2x-11[/tex]
help please !!! x/4 = 9/x
Step-by-step explanation:
x/4=9/x
x.x=4.9
x^2=36
√x=√6
x=6
What percent of the large square is shaded?
Answer:
48%
Step-by-step explanation:
a little less than half is shaded
The percent of the shaded square will be 48%.
What is mean by Percentage?A number or ratio that can be expressed as a fraction of 100 or a relative value indicating hundredth part of any quantity is called percentage.
Given that;
A large square is shown in figure.
Now,
In a figure,
The number of small squares = 100
And, Number of shaded squares = 48
Hence, The percent of shaded square = 48/100 × 100
= 48%
Learn more about the percent visit:
brainly.com/question/24877689
#SPJ2
The time needed for passengers to board the Twisting Thunder roller coaster is skewed right with a mean of 49
seconds and a standard deviation of 7.1 seconds. The time to board the Spiral Wonder roller coaster is skewed left
with a mean of 44.8 seconds and a standard deviation of 3.7 seconds. What is the probability in a random sample of
32 times loading Twisting Thunder and 36 times loading Spiral Wonder that the mean time for Twisting Thunder is
less than that of Spiral Wonder?
Answer:
0.1416
Step-by-step explanation:
The probability in a random sample of 32 times loading Twisting Thunder and 36 times loading Spiral Wonder is 0.9574.
What is normal a distribution?It is also called the Gaussian Distribution. It is the most important continuous probability distribution. The curve looks like a bell, so it is also called a bell curve.
The time needed for passengers to board the Twisting Thunder roller coaster is skewed right with a mean of 49 seconds and a standard deviation of 7.1 seconds.
The probability in a random sample of 32 will be
[tex]z = \dfrac{x - \mu}{\sigma}\\\\z = \dfrac{32 - 49}{7.1}\\\\z = -2.394[/tex]
P-value from Z-Table:
P(x<32) =
The time to board the Spiral Wonder roller coaster is skewed left with a mean of 44.8 seconds and a standard deviation of 3.7 seconds.
The probability in a random sample of 36 will be
[tex]z = \dfrac{x - \mu}{\sigma}\\\\z = \dfrac{36- 44.8}{3.7}\\\\z = -2.37838[/tex]
P-value from Z-Table:
P(x<36) = 0.0086945
The probability in a random sample of 32 times loading Twisting Thunder and 36 times loading Spiral Wonder will be
[tex]\rm \dfrac{P(x < 32)}{P(x < 36)} = \dfrac{0.0083246}{0.0086945} = 0.9574[/tex]
More about the normal distribution link is given below.
https://brainly.com/question/12421652
Need help fast!!
Read the problem in the box below. See if you can figure out the most logical
answer.
If Jay ran 1 mile in 6 minutes on Monday, 2 miles in 12 minutes on Tuesday,
and 3 miles in 18 minutes on Wednesday, how many miles do you think he
might run in 24 minutes on Thursday?
A. 4 miles
B. 3 miles
C. 5 miles
D. 2 miles
SUBMIT
Answer:
4 miles
Step-by-step explanation:
four times six equals 24
its the number of miles times six equals the minutes
Help Pleaseeeeeeeeeeeeee!!!!!!!!! Help!!!!!!!
Answer:
i think its C and E
Step-by-step explanation:
( correct me if im wrong, i hope this helps!! )
i take out the belt for u my I0ved 1.
no h0.mõ if u a man. . .
Answer:
Truw
Step-by-step explanation:
It is exceptional
Please explain
swimming at a rate of 40 yards per minute for 30 minutes will burn 150 calories. How many minutes must a person swim at this rate to burn 900 calories?
Answer:
180 minutes so 3 hours
Step-by-step explanation:
Help me out please !!!!!!
Given:
A line segment AB on a coordinate plane.
The rule of translation is
[tex]f(x,y)\to (x-6,y-3)[/tex]
To find:
The coordinates of A' and B'.
Solution:
From the given graph, it is clear that the coordinates of A and B are A(1,3) and B(5,1).
The rule of translation is
[tex]f(x,y)\to (x-6,y-3)[/tex]
Using this rule, we get
[tex]A(1,3)\to A'(1-6,3-3)[/tex]
[tex]A(1,3)\to A'(-5,0)[/tex]
And,
[tex]B(5,1)\to B'(5-6,1-3)[/tex]
[tex]B(5,1)\to B'(-1,-2)[/tex]
Therefore, the coordinates of A' and B' are A'(-5,0) and B'(-1,-2).
A principal of $4200 is invested at 9% Interest, compounded annually. How much will the investment worth after 6 years? Use the calculator provided and round your answer to the nearest dollar
What are the slope and y-intercept of the line?
y
10
00
6
4
2
0
0
N
4
6
8
The slope is
Answer:
the slope is 4,3 and the y intercept is 2
Answer:
Niiger
Step-by-step explanation:
PLEASE ANSWER ASAP FOR BRAINLEST!!!!!!!!!!!!!!!!!!!!
What is the solution
A. -2
B.1
C.(1,2)
D.(1,-1)
Answer:
Option D
Step-by-step explanation:
Two lines given in the graph represent the system of linear equations.
Solution of the system of linear equations is given by the common points of both the lines Or point of intersections of these lines.
Point of intersection of these lines → (1, -1)
Therefore, solution of the given system of equations will be (1, -1)
Option D is the answer.
i giveeeeeeeeeeee brainlilstttttttttttttttt
A subway train arrives at the station every 9 minutes. You have a doctor’s appointment near the station,
so you take the subway and arrive at 10:06. You are finished with your appointment at 11:44.
When will the next subway train arrive at the station?
The next train will arrive at
Answer:
THE swords men and archer men will take over
Step-by-step explanation:
A line passes through the points (-4, 8) and (3, -7).
Answer all parts of the question.
Part A: What is the slope of the line that passes through these points.
Part B: What is the equation of the line that passes through these points.
Part C: Where does the line intersect the x-axis and y-axis?
Answer: (hope I got them correct)
A) -15/7
B) [tex]y=-\frac{15}{7}x-\frac{4}{7}[/tex]
C) It cuts the x-axis at (-4/15,0) and the y-axis at (0,-4/7).
Step-by-step explanation:
A) Slope = [8-(-7)]/(-4-3) = -15/7
B) Let [tex]y=-\frac{15}{7}x+c[/tex] be the required equation.
Substitute x=-4, y=8.
8=(-15/7)(-4)+c
c=-4/7
The equation is therefore [tex]y=-\frac{15}{7}x-\frac{4}{7}[/tex].
C) Substitute y=0, we will get x = -4/15 i.e. it cuts the x-axis at (-4/15,0).
Substitute x=0, we will get y = -4/7 i.e. it cuts the y-axis at (0,-4/7).
The cost to the store is $45. They will use a 35% markup. What is the selling price?
f(x) = –22 + 10x – 2
Find f(-5)
Answer:
f(-5) = -74 you have to change the x to -5 and then solve
The amount of money spent weekly on cleaning, maintenance, and repairs at a large restaurant was observed over a long period of time to be approximately normally distributed, with mean μ = $633 and standard deviation σ = $45.
(a) If $646 is budgeted for next week, what is the probability that the actual costs will exceed the budgeted amount? (Round your answer to four decimal places.)
(b) How much should be budgeted for weekly repairs, cleaning, and maintenance so that the probability that the budgeted amount will be exceeded in a given week is only 0.09? (Round your answer to the nearest dollar.)
$
Answer:
(a) 0.3863
(b) $693
Step-by-step explanation:
Mean μ = $633
Standard deviation σ = $45.
(a) If $646 is budgeted for next week, what is the probability that the actual costs will exceed the budgeted amount? (Round your answer to four decimal places.)
We solve this question using the z score formula
z = (x-μ)/σ
where:
x is the raw score
μ is the population mean
σ is the population standard deviation.
For x > $646
z = $646 - $633/$45
z = 0.28889
Probability value from Z-Table:
P(x<646) = 0.61367
P(x>646) = 1 - P(x<646) = 0.38633
Approximately = 0.3863
The probability that the actual costs will exceed the budgeted amount is 0.3863
(b) How much should be budgeted for weekly repairs, cleaning, and maintenance so that the probability that the budgeted amount will be exceeded in a given week is only 0.09? (Round your answer to the nearest dollar.
Let the budgeted amount = x
Converting 0.09 to percentage = 0.09× 100% = 9%
100 - 9% = 91%
We find the z score of 91%
= 1.341
We are to find x
Using z score formula
z = (x-μ)/σ
1.341 = x - 633/45
Cross Multiply
1.341 × 45 = x - 633
60.345 = x - 633
x = 60.345 + 633
x = $693.345
Approximately to the nearest dollar is $693
2 divided into 3 multiply 1
Answer:
either 2/3
or 3/2
but its probably 2/3
thanks for the easy points!
Step-by-step explanation:
what are two ratios that are equivalent to 1:1
Answer:
2:14 and 3:21
Step-by-step explanation:
Kyle's doctor told him that in order to lose weight, he needs to eat less than 2,000 calories a day. He eats 875 calories for breakfast and than 3 protein smoothies. How many calories can the protein smoothies have to reach his goal?
Answer:
375 calories each
Step-by-step explanation:
2000-875=1125
1125/3=375
Reaner Recycling collected 7/4 ton of aluminum last Saturday. If 7/8 ton of aluminum can be shredded each day, how many days will it take to process what was collected on Saturday?
help me please it is hard
Answer:
2 days
Step-by-step explanation:
You would have to change 7/4 to have the same common denominator as 7/8, which is 8. 7/4 is equal to 14/8, or 1 6/8. Then you would subtract 1 6/8 by 7/8. What would be left would be 7/8. And of course, 7/8 minus 7/8 would be 0.
Hope this help you
In the diagram below, AB is parallel to CD. What is the value of x?
B
459
A. 30
B. 45
C. 60
D. 135
Answer:
Could you show the diagram?
15 points!! Please help
Answer:
3 feet
Step-by-step explanation:
Answer:
3 feet
Step-by-step explanation:
A dilation is changing the size of a figure. A factor of 2.5 would mean to multiply it by 2.5.
1.2 x 2.5 is 3
3 ft is the answer
how many hours and minutes are there between 9:30 and 1:50
Answer:
4 hours and 20 minutes!
Answer:
Step-by-step explanation:
PM or AM?
If it is 9:30 AM to 1:50 PM, it is 4 hours and 20 minutes.
if it is 9:30 PM to 1:50 AM, it is also 4 hours and 20 minutes.
If it is 9:30am to 1:50 AM, it is 16 hours and 20 minutes.
A blueprint uses a scale factor of 3 inches = 2 feet. What is the area on the blueprint of a 3,500 square foot house in inches?
Answer:
7875 square inches
Step-by-step explanation:
4ft^2 = 2ft * 2ft
4ft^2 = 3in * 3in
4ft^2 = 9in^2
For 3,500 square foot
3,500 square foot = x
Divide bith expressions
4/3500 = 9/x
4x = 9 * 3500
4x = 31500
x = 31500/4
x = 7875 square inches
Hence the area of the house in inches is 7875 square inches
Please help me with this :,)
Answer:
alright gotcha!
Step-by-step explanation:
I am attaching the photo gimme some time
Which example shows the distributive property?
a. a (b + c) = ab +ac
b. (a + b) + 9 = a (9 + b)
c. a + a + a = 3a
d. a(0)