what language is accepted by the turing machine whose transition graph is in the figure below?(10 points)

Answers

Answer 1

Note that the language accepted by the Turing machine whose transition graph is in the figure below is the set of all strings that start with a 1 and end with an equal number of 0s and 1s. (Machine Language)

What is machine language?

Machine language, also known as machine code, is a low-level programming language consisting of binarycode that can be directly executed by a   computer's processor.

It represents instructions   and data in a form that the computer can understand and execute,providing the fundamental instructions for performing tasks at the hardware level.

Learn more about machine language at:

https://brainly.com/question/28432869

#SPJ1


Related Questions

Other Questions
what hall voltage (in mv) is produced by a 0.160 t field applied across a 2.60 cm diameter aorta when blood velocity is 59.0 cm/s? Market Short-term Long-tern Transportation -0.6 -1.9 Food -0.7 -2.3 Alcohol and Tabacco -0.3 -0.9 Recreation -1.1 -8.5 Clothing -0.9 -2.9 a. In the short-term, what are the markets in which the demand is elastic and inelastic. Explain your answer! b. Suppose the price in each market is expected to increase in the short-term by 5%. How will this affect the sales (in other words, the quantity demanded) in each market. Explain your answer! c. As we transition from short-term to long-term, what do you notice in the elasticity in the different markets? Could you explain what you observed? Which of the following receives their energy from the sun's light to generate a sugar source for cellular respiration?PhototrophsLithotrophsChemotrophsHeterotrophs The Department of Agriculture came out today with its prediction for food price next year-4 to 5 percent increases on top of this year's already steep gains... Eggs, dairy products and cereals are up 10 percent. But the USDA says another big part of the American diet has seen only moderate price increases. Beef, poultry and pork will be up only 3 percent this year." Suppose the price elasticity of demand for beef is elastic. Consumption would then A) decrease by less than 3 percent. B) increase by less than 3 percent. C) decrease by greater than 3 percent. D) increase by greater than 3 percent. an object moves with constant speed of 16.1 m/s on a circular track of radius 100 m. what is the magnitude of the object's centripetal acceleration? What is organizational context and what stage is it observed bya prudent project manager? If there care 30 trucks and 7 of them are red. What fraction are the red trucks Which of the following products would be "costed" using a job costing system?A. dozens of donuts to be sold in a local coffee shop franchiseB. the restoration of 15 various antique Ford Motor carsC. boxes of Kellogg's' corn flakesD. hundreds of boxes of Expo Dry Erase Markers (low odor) Describe the institutional, social, technical, financial, economic and environmental sustainability factors of a career development program according to the following project activities:--Organize programs for parents/guardians on choosing career paths for their wards.-Demystifying untruths or falsehoods about certain courses.-The media broadcasting various carrier paths/professions.-Guidance and Counseling units equipped with career path development skills. which of the following will copy the contents of register t1 to register t0? group of answer choices lw $t1, 0($t0) lw $t0, 0($t1) sw $t1, 0($t0) sw $t0, 0($t1) move $t0, $t1 move $t1, $t0 Consider the following series. n = 1 n The series is equivalent to the sum of two p-series. Find the value of p for each series. P1 = (smaller value) P2 = (larger value) Determine whether the series is convergent or divergent. o convergent o divergent 4. What is the SSE in the following ANOVA table? [2pts] Sum of squares d.f. 5 Treatments Error 84 Mean squares 10 F-statistic 3.24 Sage Hill Corporation has the following cost records for June 2022. Indirect factory labor $5,100 Factory utilities Direct materials used 22,000 Work in process, 6/1/22 3,300 Work In process, 6/30/22 4,200 Finished goods, 6/1/22 5,500 Finished goods, 6/30/22 8,250 Depreciation, factory equipment Direct labor Maintenance, factory equipment Indirect materials used. Factory manager's salary $450 1,550 44,000 2,000 2,550 3,300 Prepare an income statement through gross profit for June 2022 assuming sales revenue is $100,700. SAGE HILL CORPORATION Income Statement (Partial) $ -712.5 III A diamond's price is determined by the Five Cs: cut, clarity,color, depth, and carat weight. Use the data in the attached excelfile "Diamond data assignment " :1)To develop a linear regression Carat Cut 0.8 Very Good H 0.74 Ideal H 2.03 Premium I 0.41 Ideal G 1.54 Premium G 0.3 Ideal E H 0.3 Ideal 1.2 Ideal D 0.58 Ideal E 0.31 Ideal H 1.24 Very Good F 0.91 Premium H 1.28 Premium G 0.31 Idea what is for the reaction at body temperature (37.0 c) if the concentration of a is 1.6 m and the concentration of b is 0.65 m ? Find the sum of the first 27 termsof the arithmetic sequence.First, fill in the equation.a= 5 and a27Sn = 2/(a + an)Sn =[?]2+=83 Bonds and Their Valuation: Calculating Yields Unlike the coupon interest rate, which is fixed, a bond's yield varies from day to day depending on market conditions. To be most useful, it should give us an estimate of the rate of return an investor would earn if that investor purchased the bond today and held it for its remaining life. There are three different yield calculations: Current yield, yield to maturity, and yield to call. A bond's current yield is calculated as the annual interest payment divided by the current price. Unlike the yield to maturity or the yield to call, it does not represent the actual return that investors should expect because it does not account for the capital gain or loss that will be realized if the bond is held until it matures or is called. This vield was popular before calculators and computers came along because it was easy to calculate; however, because it can be misleading, the yield to maturity and yield to call are more relevant. The yield to maturity (YTM) is the rate of return earned on a bond if it is held to maturity. It is the interest rate that forces the present value of the bond to equal the present values of the interest payments received during the life of the bond and the maturity value received at the bond's maturity. Calculate YTM using a financial calculator by entering the number of payment periods until maturity for N, the price of the bond for PV, the interest payments for PMT, and the maturity value for FV. Then solve for 1/YR YTM. Remember, you need to make the appropriate adjustments for a semiannual bond and realize that the calculated 1/YR is on a periodic basis so you will need to multiply the rate by 2 to obtain the annual rate. In addition, you need to make sure that the signs for PMT and FV are identical and that the opposite sign is used for PV; otherwise, your answer will be incorrect The yield to call (YTC) is the rate of return earned on a bond when it is called before its maturity date. The equation for solving for the YTC is shown below! Price of bond - Int. (1+2) + Call price (1+r) Calculate YTC using a financial calculator by entering the number of payment periods until call for N, the price of the band for PV, the interest payments for PMT, and the call price for FV. Then you can solve for 1/YR YTC. Again, remember you need to make the appropriate adjustments for a semiannual bond and realize that the calculated I/YR is on a periodic basis so you will need to multiply the rate by 2 to obtain the annual rate. In addition, you need to make sure that the signs for PMT and FV are identical and the opposite sign is used for PV; otherwise, your answer will be incorrect. A company is more likely to call its bonds if they are able to replace their current high-coupon debt with less expensive financing. A bond is more likely to be called if its price is Select par-because this means that the going market interest rate is less than its coupon rate. Quantitative Problem: Ace Products has a bond issue outstanding with 15 years remaining to maturity, a coupon rate of 7.6% with semiannual payments of $38, and a par value of $1,000. The price of each bond in the issue is $1,220.00. The bond issue is callable in 5 years at a call price of $1,076. What is the band's current yield? Do not round Intermediate calculations. Round your answer to two decimal places. What is the band's nominal annual yield to maturity (YTM)? Do not round intermediate calculations. Round your answer to two decimal places. What is the band's nominal annual yield to call (YTC)? Do not round intermediate calculations. Round your answer to two decimal places. Assuming interest rates remain at current levels, will the bond issue be called? The firm sewd call the bond. The ADT stack lets you peek at its top entry without removing it. For some applications of stacks, you also need to peek at the entry beneath the top entry without removing it. We will call such an operation peek2: If the stack has more than one entry, peek2 method returns the second entry from the top without altering the stack. If the stack has fewer than two entries, peek2 throws InsufficientNumberOfElementsOnStackException. Write a linked implementation of a stack that includes a method peek2Skeleton of LinkedStack class is provided. The class includes main with test cases to test your methods.public final class LinkedStack implements TextbookStackInterface{ private Node topNode; // references the first node in the chain public LinkedStack() { this.topNode = null; // TODO PROJECT #3 } // end default constructor public void push(T newEntry) { // TODO PROJECT #3 } // end push public T peek() throws InsufficientNumberOfElementsOnStackException { // TODO PROJECT #3 return null; // THIS IS A STUB } // end peek public T peek2() throws InsufficientNumberOfElementsOnStackException { // TODO PROJECT #3 return null; // THIS IS A STUB } // end peek2 public T pop() throws InsufficientNumberOfElementsOnStackException { // TODO PROJECT #3 return null; // THIS IS A STUB } // end pop public boolean isEmpty() { // TODO PROJECT #3 return false; // THIS IS A STUB } // end isEmpty public void clear() { // TODO PROJECT #3 } // end clear // These methods are only for testing of array implementation public int getTopIndex() { return 0; } public int getCapacity() { return 0; } private class Node { private S data; // Entry in stack private Node next; // Link to next node private Node(S dataPortion) { this(dataPortion, null); } // end constructor private Node(S dataPortion, Node linkPortion) { this.data = dataPortion; this.next = linkPortion; } // end constructor } // end Node public static void main(String[] args) { System.out.println("*** Create a stack ***"); LinkedStack myStack = new LinkedStack(); System.out.println("--> Add to stack to get: " + "Joe Jane Jill Jess Jim\n"); myStack.push("Jim"); myStack.push("Jess"); myStack.push("Jill"); myStack.push("Jane"); myStack.push("Joe"); System.out.println("Done adding 5 elements.\n"); System.out.println("--> Testing peek, peek2, and pop:"); while (!myStack.isEmpty()) { String top = myStack.peek(); System.out.println(top + " is at the top of the stack."); try { String beneathTop = myStack.peek2(); System.out.println(beneathTop + " is just beneath the top of the stack."); } catch (InsufficientNumberOfElementsOnStackException inoeose) { System.out.println(" CORRECT - exception has been thrown: " + inoeose.getMessage()); } top = myStack.pop(); System.out.println(top + " is removed from the stack.\n"); } // end while System.out.println("--> The stack should be empty: "); System.out.println("isEmpty() returns " + myStack.isEmpty()); try { String top = myStack.peek(); System.out.println(top + " is at the top of the stack."); } catch (InsufficientNumberOfElementsOnStackException inoeose) { System.out.println(" CORRECT - exception has been thrown: " + inoeose.getMessage()); } try { String top = myStack.pop(); System.out.println(top + " is at the top of the stack."); } catch (InsufficientNumberOfElementsOnStackException inoeose) { System.out.println(" CORRECT - exception has been thrown: " + inoeose.getMessage()); } try { String beneathTop = myStack.peek2(); System.out.println(beneathTop + " is just beneath the top of the stack."); } catch (InsufficientNumberOfElementsOnStackException inoeose) { System.out.println(" CORRECT - exception has been thrown: " + inoeose.getMessage()); } System.out.println("*** Done ***"); } // end main} // end LinkedStackpublic class InsufficientNumberOfElementsOnStackException extends RuntimeException{ public InsufficientNumberOfElementsOnStackException(String reason) { super(reason); }} find the equations of the tangents to the curve x = 6t2 4, y = 4t3 4 that pass through the point (10, 8) which location is most appropriate to meet a program participant for counseling?