Answer:
a) You have found the critical path
Explanation:
The Time Cost Critical Path Method(CPM) in project management works by adding up/calculating duration of all tasks/activities in the project in order to find the longest time possible to complete the project. It is a method to estimate project duration using a flow chart that shows a network of tasks and estimated duration(start and finish times). The critical path is reached when project time is at the maximum/longest time of completion.
1. Inventory that consists of the costs of the direct and indirect materials that have not yet entered the manufacturing process is known as ________. work in process inventory materials inventory finished goods inventory None of these choices are correct.
Answer:
materials inventory
Explanation:
An inventory is a term used to describe a list of finished goods, goods still in the production line and raw materials that would be used for the manufacturing of more goods in a bid to meet the unending consumer demands.
Basically, an inventory can be classified into three (3) main categories and these are; finished goods, work in progress, and raw materials.
An inventory is recorded as a current asset on the balance sheet because it's primarily the most important source of revenue for a business entity.
Generally, the three (3) main cost concept associated with an inventory include;
1. First In First Out (FIFO).
2. Last In First Out (LIFO).
3. Weighted average cost.
In Financial accounting, direct cost can be defined as any expense which can easily be connected to a specific cost object such as a department, project or product. Some examples of direct costs are cost of raw materials, machineries or equipments.
On the other hand, any cost associated with the running, operations and maintenance of a company refers to indirect costs. Some examples of indirect costs are utility bill, office accessories, diesel etc.
Materials inventory can be defined as an inventory that comprises of direct and indirect materials costs which have not been used in a manufacturing process.
9. Suppose Betty saves $200 each month in her 401(k) account. How much less will her monthly take-home pay be than if she saved nothing? (Assume a combined 20% state and federal income tax rate.)
Answer:
$160
Explanation:
The way 401(k) savings work is that employees can save from their earnings before tax is deducted, which means that on the $200 saved no tax is deducted, hence, the take of the employee reduces by $200
When there are savings, a tax of 20% would have been deducted from the $200, as a result, the employee would be left with $160($200-($200*20%)), which means that take-home would reduce by $40, the amount tax deducted.
The reduction in take-home=$200-$40
The reduction in take-home=$160
A company reported the following asset and liability balances at the end of 2015 and 2016:
2015 2016
Assets $150,000 $180,000
Liabilities $70,000 $80,000
If the company paid dividends totaling $5,000, what is the amount of net income for 2016?
A. $20,000.B. $105,000.C. $80,000.D. $25,000.
Answer:
D. $25,000
Explanation:
The equity is the difference between assets and liabilities
Opening equity=$150,000-$70,000
opening equity=$80,000
Ending equity=$180,000-$80,000
ending equity=$100,000
The ending equity formula below can be used to derive the net income for 2016:
ending equity=beginning equity+ net income-dividends
The net income increases the amount of ending equity while dividends decrease it.
net income=unknown
dividends=$5000
$100,000=$80,000+net income-$5000
net income=$100,000-$80,000+$5,000
net income=$25,000
Journalize the following sales transactions for Antique Mall. Explanations are not required. The company estimates sales returns at the end of each month.
Jan. 4 Sold $14,000 of antiques on account, credit terms are n/30. Cost of goods is $7,000.
8 Received a $400 sales return on damaged goods from the customer. Cost of goods damaged is $150.
13 Antique Mall received payment from the customer on the amount due from Jan. 4, less the return.
20 Sold $4,900 of antiques on account, credit terms are 1/10, n/45, FOB destination. Cost of goods is $2,450.
20 Antique Mall paid $70 on freight out.
29 Received payment from the customer on the amount due from Jan. 20, less the discount.
Answer:
Antique Mall
Journal Entries:
Jan. 4 Debit Accounts Receivable $14,000
Credit Sales Revenue $14,000
credit terms are n/30.
Debit Cost of goods sold $7,000
Credit Inventory $7,000
Jan. 8 Debit Sales Returns $400
Credit Accounts Receivable $400
Debit Damaged Goods $150
Credit Cost of goods sold $150
Jan. 13 Debit Cash $13,600
Credit Accounts Receivable $13,600
Jan. 20 Debit Accounts Receivable $4,900
Credit Sales Revenue $4,900
credit terms are 1/10, n/45, FOB destination.
Debit Cost of goods sold $2,450
Credit Inventory $2,450
Jan. 20 Debit Freight-out Expense $70
Credit Cash $70
Jan. 29 Debit Cash $4,851
Debit Cash Discounts $49
Credit Accounts Receivable $4,900
Explanation:
a) Data and Analysis:
Jan. 4 Accounts Receivable $14,000 Sales Revenue $14,000
credit terms are n/30.
Cost of goods sold $7,000 Inventory $7,000
Jan. 8 Sales Returns $400 Accounts Receivable $400
Damaged Goods $150 Cost of goods sold $150
Jan. 13 Cash $13,600 Accounts Receivable $13,600
Jan. 20 Accounts Receivable $4,900 Sales Revenue $4,900
credit terms are 1/10, n/45, FOB destination.
Cost of goods sold $2,450 Inventory $2,450
Jan. 20 Freight-out Expense $70 Cash $70
Jan. 29 Cash $4,851 Cash Discounts $49 Accounts Receivable $4,900
The inventory records of Global Company indicate that $76,800 of merchandise should be on hand at the end of the month. The physical inventory indicates that $74,900 is actually on hand. The journal entry to adjust for inventory shrinkage will include
Answer:
Debit : Inventory $1,900
Credit : Adjustment to inventory account $1,900
Explanation:
The journal entry to adjust for inventory shrinkage will include a Debit entry to Inventory Account (to raise the balance) and a Credit entry to a Contra account Adjustment to inventory account with the difference between the two balances.
Herman Company has three products in its ending inventory. Specific per unit data at the end of the year for each of the products are as follows: Product 1 Product 2 Product 3 Cost $ 35 $ 105 $ 65 Selling price 85 165 115 Costs to sell 8 70 25 Required: What unit values should Herman use for each of its products when applying the lower of cost or net realizable value (LCNRV) rule to ending inventory
Answer:
Cost Selling Price Costs to Sell NRV Inventory value
A B C D=(B-C) E=(lowerof A&D)
Product 1 35 85 8 77 35
Product 2 105 165 70 95 95
Product 3 65 115 25 90 65
[The following information applies to the questions displayed below.] Pacific Ink had beginning work-in-process inventory of $744,960 on October 1. Of this amount, $304,920 was the cost of direct materials and $440,040 was the cost of conversion. The 48,000 units in the beginning inventory were 30 percent complete with respect to both direct materials and conversion costs. During October, 102,000 units were transferred out and 30,000 remained in ending inventory. The units in ending inventory were 80 percent complete with respect to direct materials and 40 percent complete with respect to conversion costs. Costs incurred during the period amounted to $2,343,600 for direct materials and $3,027,840 for conversion.
Required:
a. Compute the equivalent units for the materials and conversion cost calculations.
b. Compute the cost per equivalent unit for direct materials and for conversion costs using the weighted-average method.
Answer:
Pacific Ink
a. The equivalent units for materials and conversion costs are:
Materials Conversion
Equivalents units 126,000 114,000
b. The cost per equivalent unit for direct materials and for conversion costs using the weighted-average method are:
Cost per equivalent unit $21.02 $30.42
Explanation:
a) Data and Calculations:
Materials Conversion Total
Work in process, Oct. 1 $304,920 $440,040 $744,960
Costs incurred in October 2,343,600 3,027,840 5,371,440
Total costs of production $2,648,520 $3,467,880 $6,116,400
Units:
Work in process, Oct. 1 48,000 (30%) 48,000 (30%)
Units transferred out 102,000 (100%) 102,000 (100%)
Work in process, Oct. 31 30,000 (80%) 30,000 (40%)
Equivalent units of production:
Units transferred out 102,000 (100%) 102,000 (100%)
Work in process, Oct. 31 24,000 (80%) 12,000 (40%)
Total equivalent units 126,000 114,000
Cost per equivalent units:
Total costs of production $2,648,520 $3,467,880 $6,116,400
Total equivalent units 126,000 114,000
Cost per equivalent unit $21.02 $30.42
Before reconciling its bank statement, Lauren Cosmetics Corporation's general ledger had a month-end balance in the cash account of $8,250. The bank reconciliation for the month contained the following items:Deposits in transit $870Outstanding checks 645Interest earned 20NSF check returned to bank 220Bank service charge 70Given the above information, what up-to-date ending cash balance should Lauren report at month-end?A. $7,380.B. $8,530.C. $7,980.D. $7,700.
Answer:
a. $7,380
Explanation:
Ending cash balance = Cash balance + Interest earned - NSF check returned to bank - Bank service charge
Ending cash balance = $8,250 + $20 - $220 - $70
Ending cash balance = $7,980
So, $7,380 is the up-to-date ending cash balance should Lauren report at month-end.
If the dollar contribution margin per unit is increased by 8%, total fixed expenses is decreased by 18%, and all other factors remain the same, net operating income will:
Answer:
Increase
Explanation:
Since the Contribution increased and Fixed Costs have decreased, the resulting effect is an Increase in Net Operating Income. Thus, all other factors remain the same, net operating income will: Increase
Exercise 4-9 Recording purchases, sales, returns, and shipping LO P1, P2 Following are the merchandising transactions of Dollar Store. Nov. 1 Dollar Store purchases merchandise for $2,900 on terms of 2/5, n/30, FOB shipping point, invoice dated November 1. 5 Dollar Store pays cash for the November 1 purchase. 7 Dollar Store discovers and returns $250 of defective merchandise purchased on November 1, and paid for on November 5, for a cash refund. 10 Dollar Store pays $145 cash for transportation costs for the November 1 purchase. 13 Dollar Store sells merchandise for $3,132 with terms n/30. The cost of the merchandise is $1,566. 16 Merchandise is returned to the Dollar Store from the November 13 transaction. The returned items are priced at $270 and cost $135; the items were not damaged and were returned to inventory. Journalize the above merchandising transactions for the Dollar Store assuming it uses a perpetual inventory system and the gross method.
Answer:
Dollar Store
Journal Entries:
Nov. 1 Debit Inventory $2,900
Credit Accounts Payable $2,900
To record the purchase of goods on terms of 2/5, n/30, FOB shipping point, invoice dated November 1.
Nov. 5 Debit Accounts Payable $2,900
Credit Cash $2,842
Credit Cash Discount $58
To record the payment for the goods, including discounts.
Nov. 7 Debit Cash $250
Credit Inventory $250
To record the return of goods for cash.
Nov. 10 Debit Freight-in $145
Credit Cash $145
To record payment for transportation of goods.
Nov. 13 Debit Accounts Receivable $3,132
Credit Sales Revenue $3,132
To record the sale of goods with terms n/30.
Debit Cost of goods sold $1,566
Credit Inventory $1,566
To record the cost of goods sold.
Nov. 16 Debit Sales Returns $270
Credit Accounts Receivable $270
To record the return of goods.
Debit Inventory $135
Credit Cost of goods sold $135
To record the cost of goods returned.
Explanation:
a) Data and Analysis:
Nov. 1 Inventory $2,900 Accounts Payable $2,900
on terms of 2/5, n/30, FOB shipping point, invoice dated November 1.
Nov. 5 Accounts Payable $2,900 Cash $2,842 Cash Discount $58
Nov. 7 Cash $250 Inventory $250
Nov. 10 Freight-in $145 Cash $145
Nov. 13 Accounts Receivable $3,132 Sales Revenue $3,132
with terms n/30
Cost of goods sold $1,566 Inventory $1,566
Nov. 16 Sales Returns $270 Accounts Receivable $270
Inventory $135 Cost of goods sold $135
On January 1, a machine with a useful life of 5 years and a salvage value of $15000 was purchased for $115000. What is the depreciation expense for year 2 under straight-line depreciation
Answer:
Annual depreciation (year 2)= $20,000
Explanation:
Giving the following information:
Purchase price= $115,000
Salvage value= $15,000
Useful life= 5 years
To calculate the annual depreciation under the straight-line method, we need to use the following formula:
Annual depreciation= (original cost - salvage value)/estimated life (years)
Annual depreciation= (115,000 - 15,000) / 5
Annual depreciation= $20,000
MC Qu. 157 West Company estimates that overhead costs... West Company estimates that overhead costs for the next year will be $3,600,000 for indirect labor and $880,000 for factory utilities. The company uses machine hours as its overhead allocation base. Of 125,000 machine hours are planned for this next year, what is the company's plantwide overhead rate
Answer:
$35,84 per machine hour
Explanation:
Plantwide overhead rate = Budgeted overheads ÷ Budgeted Activity
where,
Budgeted overheads = $3,600,000 + $880,000 = $4,480,000
Budgeted Activity = 125,000 machine hours
therefore,
Plantwide overhead rate = $4,480,000 ÷ 125,000
= $35,84 per machine hour
As the number of people holding college degrees increases, assuming the demand for college educated labor stays constant, the wages of college educated people would
Answer:
decrease
Explanation:
An increase in the supply of people with college degrees would lead to a rightward shift of the supply curve. This leads to a decrease in equilibrium wages and an increase in labour
Russell Retail Group begins the year with inventory of $62,000 and ends the year with inventory of $52,000. During the year, the company has four purchases for the following amounts.
Purchase on February 17 $217,000
Purchase on May 6 137,000
Purchase on September 8 167,000
Purchase on December 4 417,000
Required:
Calculate cost of goods sold for the year.
Answer:
Cost of goods sold = 948000
Explanation:
Inventory at the beginning of the year = $62000
Inventory at the end of the year = $52000
Cost of goods sold = Beginning inventory + purchases during the year - ending inventory
Cost of goods sold = $62000 + 217000 + 137000 + 167000 + 417000 - $52000
Cost of goods sold = 948000
Rick has met with the Small Business Administration, which analyzed his entrepreneurial skills and provided him with a summary of the results. Out of these findings of the SBA, what might challenge Rick in his quest to become a successful entrepreneur? a) Rick is conscientious and emotionally stable. b) Rick has some tolerance for ambiguity because he knows he is trying to do things that haven't been done before. c) Rick has an external locus of control. d) Rick is comfortable with a moderate level of risk, and he has the confidence to act decisively. e) Rick has a high nec Rick has a high need for autonomy and wants to shape his own destiny
Answer:
c) Rick has an external locus of control.
Explanation:
What can challenge Rick in his quest to become a successful entrepreneur is that he has an external locus of control, which occurs when an individual relates events related to their failures or successes to external variables that are not their responsibility, such as fate, luck or bad luck.
The external locus of control can pose a challenge for Rick in the sense that an entrepreneur's success is related to his own personal control and personal efforts to make the business viable and successful in the market. It is necessary for the entrepreneur to understand that there are risks inherent to the business and that a business can work according to their efforts, learning and planning, that is, the entrepreneur and their control and management actions will be responsible for the success or failure of the business, and not just external factors like fate or bad luck.
A sole proprietorship is: Select one: A. the easiest type of business to set up B. the least profitable type of business to set up C. the most expensive type of business to set up D. the most difficult type of business to set up.
Answer:
it is an easiest type of business to set up because it requires small capital to start but has many disadvantages such as bearing all the risks alone.etc
An accounting system that provides information that management can use to evaluate the performance of a department's activities is a:______.
A. Service accounting system.
B. Standard accounting system.
C. Revenue accounting system.
D. Departmental accounting system.
E. Cost accounting system.
Answer: D. Departmental accounting system.
Explanation:
As the term implies, Departmental accounting system engages in accounting for individual departments. The financial information of the department of interest will be recorded as well as other activities.
Management will then use this information to analyze and understand how well the department is doing. The information will also tell them if the department is being cost efficient and profitable.
Which of the following statements about inflation is true? A. Inflation is not a problem because it is just another way for the government to collect revenuelong dash an alternative to the income tax or the sales tax. B. Inflation is a tax on spending money. C. Inflation is a tax on holding money. D. Inflation occurs when real GDP grows more rapidly than the quantity of money.
Answer:
C
Explanation:
Inflation is a persistent rise in the general price levels
Inflation occurs when quantity of money grows faster than real GDP
Types of inflation
1. demand pull inflation – this occurs when demand exceeds supply. When demand exceeds supply, prices rise
2. cost push inflation – this occurs when the cost of production increases. This leads to a reduction in supply. Higher prices are the resultant effect
Shoe leather cost is when people try to spend money immediately so they would not be holding money for a long time. This is because money loses its value in an inflation.
Because inflation causes money to lose its value, it can be viewed as a form of tax on holding money This is because, tax reduces the amount of money a person has. Also, does inflation reduce the value of money a person has
Project 1 requires an original investment of $125,000. The project will yield cash flows of $50,000 per year for 10 years. Project 2 has a computed net present value of $135,000 over an eight-year life. Project 1 could be sold at the end of eight years for a price of $8,000. (a) Using the present value tables in Exhibits 2 and 5, determine the net present value of Project 1 over an eight-year life, with residual value, assuming
Answer: $126,613
Explanation:
Net Present value of Project A is:
= Present value of $50,000 annuity + Present value of residual value - Initial investment
Present value of $50,000 annuity:
= 50,000 * ( 1 - ( 1 + rate)^-number of periods) / rate
= 50,000 * ( 1 - ( 1 + 12%) ⁻⁸) / 12%
= $248,382
Present value of residual value:
= 8,000 / ( 1 + 12%)⁸
= $3,231
Net present value
= 248,382 + 3,231 - 125,000
= $126,613
g dividends paid 13500. what was the net income for the past year of the firm faces a tax rate of 30%
Answer:
A.) £27,214.29
B.) £19,250
Step-by-step explanation:
Given the following :
Andy £13500
Bevan £27500
Cheryl £13250
Deva £75000
Elliott £18750
Frankie £27500
Grace £15000
Mean income = (total sum of salaries / number of workers)
Mean income = £(13500 + 27500 + 13250 + 75000 + 18750 + 27500 + 15000) / 7
Mean income = (£190,500 / 7) = £27,214.286
B.) mean income excluding Deva's salary:
Mean income = Mean income = £(13500 + 27500 + 13250 + 18750 + 27500 + 15000) / 7
Mean income = £115,500 / 6
Mean income = £19,250
However, similar to bonds, preferred stockholders receive a fixed payment—their dividend—before the company’s residual earnings are paid out to its common stockholders and, as with common stock, preferred stockholders can benefit from an appreciation in the value of the firm’s stock securities. Consider the following case of Wellington Industries: Wellington Industries pays an annual dividend rate of 8.00% on its preferred stock that currently returns 10.72% and has a par value of $100.00 per share. What is the value of Wellington’s preferred stock?
Answer: $74.63
Explanation:
Preferred shares are treated like perpetuities which means that the value is:
= Annual dividend/required return
Annual dividend:
= Dividend rate * Par value
= 8% * 100
= $8.00
Value of share = 8 / 10.72%
= $74.6269
= $74.63
Viviano Corporation issued a new bond, and hired your bank as its underwriter. In an upcoming talk with its CFO, you are expected to explain the effect of market interest rate. An increase in the market rate of interest will have which one of the following effects on this bond?
a. increase the coupon rate
b. decrease the coupon rate
c. increase the market price
d. decrease the market price
e. increase the time period
Answer: d. decrease the market price
Explanation:
Interest rates and the prices of bonds are negatively correlated as one increasing means that the other is decreasing.
The reason is this: when market interest rates rise, investors will move away from bonds to other investments because bonds offer a fixed payment and so will be less attractive than other investments which would be offering higher returns based on the higher market rates.
The drop in demand for bonds will lead to their prices falling as per the rules of demand and supply.
New educational study has proven that the practice of writing, erasing, and rewriting improves students' ability to process information, leading parents to steer away from pen use in favor of pencils.
a. True
b. False
A company's gross profit (or gross margin) was $110,180 and its net sales were $439,300. Its gross margin ratio is: A. 74.9%. B. 8.4%. C. $110,180.00 D. 25.1%. E. $329,120.00
Answer:
D
Explanation:
Gross profit margin is an example of a profitability ratio.
profitability ratios measures the efficiency with which a company generates profit from its asset
Gross profit margin measures the return on sales
Gross profit margin = gross profit / net sales
$110,180 / $439,300 = 25.1%
Harwood Company uses a job-order costing system that applies overhead cost to jobs on the basis of machine-hours. The company's predetermined overhead rate of $2.50 per machine-hour was based on a cost formula that estimates $217,500 of total manufacturing overhead for an estimated activity level of 87,000 machine-hours. Required: 1. Assume that during the year the company works only 82,000 machine-hours and incurs the following costs in the Manufacturing Overhead and Work in Process accounts: Compute the amount of overhead cost that would be applied to Work in Process for the year and make the entry in your T-accounts. 2A. Compute the amount of underapplied or overapplied overhead for the year and show the balance in your Manufacturing Overhead T-account.
Question Completion:
Manufacturing Overhead Account
Maintenance $24,000
Indirect materials 8,300
Indirect labor 82,000
Utilities 36,000
Insurance 7,300
Depreciation 65,000
Total costs $222,600
Work in Process
Direct materials $740,000
Direct labor 83,000
Answer:
Harwood Company
1. The amount of overhead cost that would be applied to Work in Process for the year is:
= $205,000.
2. T- Accounts:
Work in Process
Direct materials $740,000
Direct labor 83,000
Applied overhead 205,000
Manufacturing overhead
Maintenance $24,000
Indirect materials 8,300
Indirect labor 82,000
Utilities 36,000
Insurance 7,300
Depreciation 65,000
Applied overhead: WIP $205,000
Underapplied overhead 17,600
Total costs $222,600 $222,600
2A. The amount of underapplied overhead for the year is:
= $17,600
2B. Manufacturing overhead
Maintenance $24,000
Indirect materials 8,300
Indirect labor 82,000
Utilities 36,000
Insurance 7,300
Depreciation 65,000
Applied overhead: WIP $205,000
Underapplied overhead 17,600
Total costs $222,600 $222,600
Explanation:
a) Data and Calculations:
Predetermined overhead rate per machine-hour = $2.50
Estimated total manufacturing overhead = $217,500
Estimated activity level = 87,000
Actual results from production during the year:
Machine-hours worked = 82,000
Applied overhead costs = $205,000 (82,000 * $2.50)
Total manufacturing costs incurred = $222,600
Underapplied overhead = $17,600
The increase or decrease in owner's equity is reported on the
O A income statement.
B statement of owner's equity.
C balance sheet.
D All of the above
Accounting
Answer:
B
Explanation:
Owners equity also known as the Statement of Changes in Owner's Equity is an example of a financial statement. It records the owners equity and changes to the owners equity during a financial year.
A balance sheet is a financial statement that reports a company's assets, liabilities and shareholders' equity at a point in time.
The income statement records a company's income and expenses in a financial year. It is used for determining if a company is earning a profit or a loss
RSTN Co. produces its product through two sequential processing departments. Direct materials and conversion are added to the product evenly throughout the process. The company uses monthly reporting periods for its process costing system. During October, the company finished and transferred 150,000 units of its product to Department 2. Of these units, 30,000 were in process at the beginning of the month and 120,000 were started and completed during the month. The beginning work in process inventory was 30% complete. At the end of the month, the work in process inventory consisted of 20,000 units that were 80% complete.
Required:
Compute the number of equivalent units of production for October. Use the FIFO method.
Answer:
RSTN Co.
The number of equivalent units of production for October are:
Materials Conversion
Equivalent units of production 140,000 157,000
Explanation:
a) Data and Calculations
Units Materials Conversion
Beginning work in process 30,000 100% 30%
Units started and completed 120,000 100% 100%
Ending work in process 20,000 100% 80%
Equivalent units using FIFO method:
Units Materials Conversion
Beginning work in process 30,000 0 (0%) 21,000 (70%)
Units started and completed 120,000 120,000 (100%) 120,000 (100%)
Ending work in process 20,000 20,000 (100%) 16,000 (80%)
Equivalent units of production 140,000 157,000
A firm has taxes of $2,000, interest expense of $1,000, EBIT of $7,500, common stock dividends of $1,500, and preferred dividends of $1,200. What is the profit margin if sales are $22,000
Answer:
the profit margin is 15%
Explanation:
The computation of the profit margin is shown below:
= (EBIT - interest - taxes - preferred dividend) ÷ Sales
= ($7,500 - $1,000 - $2,000 - $1,200) ÷ $22,000
= $3,300 ÷ $22,000
= 15%
Hence, the profit margin is 15%
Basically the above formula should be applied for the same
Gary is walking through his organization's buying process and has identified some additional steps that are needed in a B2B transaction. What would be included in those additional steps
Answer: order-routine specification
problem recognition
Explanation:
Business-to-business transactions occur when a business makes a transaction with another business. It should be noted that this takes place when the business is sourcing materials which will be used for their production process.
Since Gary is walking through his organization's buying process and has identified some additional steps that are needed in a B2B transaction, the additional steps should include the order-routine specification and the problem recognition.
The acid-test ratio differs from the current ratio in that: _______
a) The acid-test ratio is a measure of liquidity but the current ratio is not.
b) Liabilities are divided by current assets
c) The acid-test ratio measures profitability and the current ratio does not.
d) Prepaid expensand inventory are excluded from the calculation of the acid-test ratio.
e) The acid-test ratio excludes short-term investments from the calculation.
Answer:
d) Prepaid expensand inventory are excluded from the calculation of the acid-test ratio.
Explanation:
The acid-test can be regarded quick ratio, this ratio makes the comparison between most short-term assets of a company and most short-term liabilities of the company in order to ascertain if there is enough cash for the company to pay immediate liabilities in the company. These immediate liabilities could be short-term debt. There is usually disregards of current assets by acid-test ratio which it's liquidation is difficult example is inventory.
Current ratio can be regarded as ratio that compares current assets of a company and the current liabilities. It can be gotten by finding ratio of current assets of the company and current liabilities. liquidity of a company can be measured using current ratio by potential creditors.
It should be noted that The acid-test ratio differs from the current ratio in that Prepaid expensand inventory are excluded from the calculation of the acid-test ratio.