Answer:
Logging while drilling (LWD) is a technique of conveying well logging tools into the well borehole downhole as part of the bottom hole assembly (BHA). ... In these situations, the LWD measurement ensures that some measurement of the subsurface is captured in the event that wireline operations are not possible
Hydraulic fracturing is: Select one: a. a first step in storage of high-level radioactive waste b. a way of extracting natural gas shale formations c. a step in oil refining where oil is separated into different viscosities d. none of the above
Shale and other types of "tight" rock, or impermeable rock formations that lock in oil and gas and complicate the production of fossil fuels, can be extracted of their natural gas or oil using the modern high-volume hydraulic fracturing process. Thus, option B is correct.
What are the factor involving in Hydraulic fracturing?Shale gas is extracted through a procedure called hydraulic fracturing, also referred to as “fracking.” Due to the fact that shale reserves are often dispersed horizontally rather than vertically, deep holes are first drilled into the shale rock, then horizontal drilling is used to reach more of the gas.
A mixture of sand, chemicals, and water is pushed at high pressure down a borehole during hydraulic fracturing. The released gas can flow out of the rocks and back up the borehole because the water pressure causes cracks in the rock to widen, and the sand particles settle into the openings to keep them open.
Therefore, a way of extracting natural gas shale formations.
Learn more about Hydraulic fracturing here:
https://brainly.com/question/28559289
#SPJ2
Troy must keep track of the amount of refrigerant he uses from a 50-pound cylinder to ensure that accurate
records are kept. He used 13 pounds on a systein for Ms. Jones and 9 pounds on a system for a commercial
client. How many pounds should he have left in the cylinder?
tof
Troy should have
pounds of refrigerant left in the cylinder.
baon naid Thamar basic
محمود احمد مجد
12
اهداء ما در
Answer:
Amount of gas still in cylinder = 28 pound
Explanation:
Given:
Amount of gas in cylinder = 50 pound
Amount of gas used in Ms. Jones system = 13 pound
Amount of gas used in client system = 9 pound
Find:
Amount of gas still in cylinder
Computation:
Amount of gas still in cylinder = Amount of gas in cylinder - Amount of gas used in Ms. Jones system - Amount of gas used in client system
Amount of gas still in cylinder = 50 - 13 - 9
Amount of gas still in cylinder = 28 pound
What is the following diagram called?
Answer:
business
Explanation:
because shopping has great income
Answer:
is ur question right
Explanation:
is ur question right
is ur question right