Answer:
0.1357 = 13.57% probability that the proportion of flops in a sample of 572 released films would be greater than 6%
Step-by-step explanation:
To solve this question, we need to understand the normal probability distribution and the central limit theorem.
Normal Probability Distribution
Problems of normal distributions can be solved using the z-score formula.
In a set with mean [tex]\mu[/tex] and standard deviation [tex]\sigma[/tex], the z-score of a measure X is given by:
[tex]Z = \frac{X - \mu}{\sigma}[/tex]
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Central Limit Theorem
The Central Limit Theorem establishes that, for a normally distributed random variable X, with mean [tex]\mu[/tex] and standard deviation [tex]\sigma[/tex], the sampling distribution of the sample means with size n can be approximated to a normal distribution with mean [tex]\mu[/tex] and standard deviation [tex]s = \frac{\sigma}{\sqrt{n}}[/tex].
For a skewed variable, the Central Limit Theorem can also be applied, as long as n is at least 30.
For a proportion p in a sample of size n, the sampling distribution of the sample proportion will be approximately normal with mean [tex]\mu = p[/tex] and standard deviation [tex]s = \sqrt{\frac{p(1-p)}{n}}[/tex]
A film distribution manager calculates that 5% of the films released are flops.
This means that [tex]p = 0.05[/tex]
Sample of 572
This means that [tex]n = 572[/tex]
Mean and standard deviation:
[tex]\mu = p = 0.05[/tex]
[tex]s = \sqrt{\frac{p(1-p)}{n}} = \sqrt{\frac{0.05*0.95}{572}} = 0.0091[/tex]
What is the probability that the proportion of flops in a sample of 572 released films would be greater than 6%?
1 subtracted by the p-value of Z when X = 0.06. So
[tex]Z = \frac{X - \mu}{\sigma}[/tex]
By the Central Limit Theorem
[tex]Z = \frac{X - \mu}{s}[/tex]
[tex]Z = \frac{0.06 - 0.05}{0.0091}[/tex]
[tex]Z = 1.1[/tex]
[tex]Z = 1.1[/tex] has a p-value of 0.8643
1 - 0.8643 = 0.1357
0.1357 = 13.57% probability that the proportion of flops in a sample of 572 released films would be greater than 6%
In an experiment, the initial temperature of a solution is -5 °C. The solution is heated up at 3 °C per minute for 19 minutes and then it is cooled at 4 °C per minute for 6 minutes. Calculate the final temperature, in °C, of the solution.
Answer:
28°C
Step-by-step explanation:
First you do 3*19=57°C
-5+57= 52°C
then you do 4*6=24 °C
as its being cooled you takeaway
52-24=28°C
A bicyclist is at point A on a paved road and must ride to point C on another paved road. The two roads meet at
an angle of 38° at point B. The distance from A to B is 18 mi, and the distance from B to C is 12 mi (see
the figure). If the bicyclist can ride 22 mph on the paved roads and 6.8 mph off-road, would it be faster for the bicyclist to ride from A to C on the paved roads or to ride a direct line from A to C off-road? Explain.
Answer:
Step-by-step explanation:
The diagrammatic expression to understand this question very well is attached in the image below.
By applying the law of cosine rule; we have:
a² = b² + c² - 2bc Cos A --- (1)b² = a² + c² - 2ac Cos B --- (2)c² = a² + b² - 2ab Cos C --- (3)From the diagram attached below, we need to determine the side "b" by using equation (2) from above:
b² = a² + c² - 2ac Cos B
From the information given:
a = 12 miles; c = 18 miles; ∠B = 38°
∴
replacing the values into the above equation:
b² = 12² + 18² - 2(12)(18) Cos (38°)
b² = 144 + 324 - 432 × (0.7880)
b² = 468 - 340.416
b² = 127.584
[tex]b = \sqrt{127.584}[/tex]
b = 11.30 miles
However, we are also being told that the speed from A → C = 6.8 mph
Thus, the time required to go from A → C can be determined by using the relation:
[tex]\mathbf{speed = \dfrac{distance}{time}}[/tex]
making time the subject of the formula, we have:
[tex]\mathbf{time= \dfrac{distance}{speed }}[/tex]
[tex]\mathbf{time= \dfrac{11.30}{6.8}}[/tex]
time = 1.66 hours
By using the paved roads, the speed is given as = 22 mph
thus, the total distance covered = |AB| + |BC|
= (18+12) miles
= 30 miles
∴
[tex]\mathbf{time= \dfrac{distance}{speed }}[/tex]
[tex]\mathbf{time= \dfrac{30}{22}}[/tex]
time = 1.36 hours
Therefore, the time used off-road = 1.661 hours while the time used on the paved road is 1.36 hours.
Since we are considering the shortest time possible;
We can conclude that it would be faster for the bicyclist to ride from A to C on the paved roads since it takes a shorter time to reach its destination compared to the time used off-road.
Learn more about Law of cosine here:
https://brainly.com/question/24077856?referrer=searchResults
It would be faster for the bicyclist to ride from A to C on the paved roads since the time to go from A to C on the paved roads is 1.4 h and the time to go from A to C off-road is 1.7 h.
To calculate which way would be faster we need to find the distance from point A to C with the law of cosines:
[tex] \overline{AC}^{2} = \overline{AB}^{2} + \overline{BC}^{2} - 2\overline{AB}\overline{BC}cos(38) [/tex]
Where:
[tex]\overline{AB}[/tex]: is the distance between the point A and B = 18 mi
[tex]\overline{BC}[/tex]: is the distance between the point B and C = 12 mi
[tex] \overline{AC} = \sqrt{(18 mi)^{2} + (12 mi)^{2} - 2*18 mi*12 mi*cos(38)} = 11.3 mi [/tex]
Now, let's find the time for the two following cases.
1. From point A to C on the paved roads (t₁)
[tex] t_{1} = t_{AB} + t_{BC} [/tex]
The time can be calculated with the following equation:
[tex] t = \frac{d}{v} [/tex] (1)
Where:
d: is the distance
v: is the velocity
Then, the total time that it takes the bicyclist to go from point A to C on the paved roads is:
[tex] t_{1} = t_{AB} + t_{BC} = \frac{18 mi}{22 mph} + \frac{12 mi}{22 mph} = 1.4 h = 84 min [/tex]
2. From point A to C off-road (t₂)
With equation (1) we can calculate the time to go from point A to C off-road:
[tex] t_{2} = \frac{\overline{AC}}{v_{2}} = \frac{11.3 mi}{6.8 mph} = 1.7 h = 102 min [/tex]
Therefore, it would be faster for the bicyclist to ride from A to C on the paved roads.
To find more about the law of cosines, go here: https://brainly.com/question/15740431?referrer=searchResults
I hope it helps you!
½ sejam berapa minit?
Answer:
1/2 jam 30 menit mungkin?
1/2 jam adalah 30 minit
1/2 × 60 = 30 mins
English translation
1/2 an hour is 30 minutes
1/2 × 60 = 30 mins
Answered by Gauthmath must click thanks and mark brainliest
HELPPPP PLZ
Witch statement is true about the value of |6|?
Answer:
The third choice is the correct one.
Step-by-step explanation:
The absolute value of six means that it's the distance from 0 to six, and that distance will be positive regardless of the number being negative or not.
Answer: The third answer is correct
Step-by-step explanation:
Since |6| is the absolute value of positive six, the value of an absolute value of any number is always positive.
Which could be a binomial expansion of (4x + y)?
16x2 + xy + y2
16x2 + 4xy + y2
O 64x3 + 16x2y + 5xy2 + y3
64x3 + 48x2y + 12xy2 + y3
+
Answer: D
Step-by-step explanation:
[tex](4x+y)^3\\\\=(4x)^3+3*(4x)^2*y+3*(4x)*y^2+y^3\\\\=64x^3+48x^2y+12xy^2+y^3\\\\Answer\ D[/tex]
Answer:
D
Step-by-step explanation:
Primo car rental agency charges $21 per day plus $0.20 por milo. Ultimo car rental agency charges $24 per day plus $1.00 per milo. Find the daily mileage for which the Ultimo charge is four times the Primo charge.
The mileage is
Answer:
300 miles
Step-by-step explanation:
Let us consider the miles they travelled is 'm'
Mileage for Primo= 21 + (m × 0.20) = 21+0.2m
Mileage for Ultimo= 24+ ( m× 1.00) = 24 + m
Question says The mileage is equal when Ultimo's charge is 4× Primo
Thus,
4 × (21+0.2m) = 24+ m
84 + 0.8m = 24 + m
60 = 0.2m
m = 300
Which of the following has the least value?
30% of 50
O 50% of 30
30% of 30
50% of 50
Answer:
30% of 30 has the least value out of all answer choices.
Step-by-step explanation:
Solve for the values of the given percentages of each number:
30% of 50:
Divide 50 by 100 to get 1%
50/100 = 0.5
Multiply 1% (0.5) by 50:
0.5 x 50 = 15
So 30% of 50 = 15
50 % of 30:
50% of a number means half of it since 50% is half of 100% so:
30/2 = 15
So 50% of 30 = 15
30% of 30:
Divide 30 by 100 to get 1%:
30/100 = 0.3
Multiply 1% (0.3) by 30:
0.3 x 30 = 9
So 30% of 30 = 9
50% of 50
50% of a number means half of it since 50% is half of 100% so:
50/2 = 25
So 50% of 50 = 25
Let’s arrange all of the values from greatest to least (left to right) to determine the most least value:
25, 15, 15, 9
9 is the most least, it is the value equal to the answer choice “30% of 30”
HOPE THIS HELPED!
You have $90 in your bank account. Each work you plan to deposit $3 from your allowance and $25 from your paycheck. The equation b: 90+ (25+5)w gives the amount b in your account after w woeks. How rary works from
now will you have $220 in your bank account?
There will be 5220 in the account after works
(Type a whole number
For the partially complete factorization, find the other binomial which will complete the factorization n^2-8n-20=(n+2)(_____)
Answer:
(n-10)
Step-by-step explanation:
Jdjdjdhbejdudjkdff
Which statement is sufficient to prove that quadrilateral ABCD is a parallelogram?
A) m∠A ≅ m∠C, m∠B ≅ m∠D
B) AB ≅ CD
C) AC ≅ BD
D) BC // AD
Answer:
A) m∠A ≅ m∠C, m∠B ≅ m∠D
Step-by-step explanation:
If both pairs of opposite angles are congruent, then the figure is a parallelogram.
9sin(Θ)-7=0. Solve the trigonometric equation
Step-by-step explanation:
here's the answer to your question
2. Solve the following system of equations. y = 5 + x 2x + 2y = 30
find the area of the shaded region
Answer:
22 cm²Step-by-step explanation:
Shaded area is the difference of the bigger circle and two smaller ones:
A = π(3²) - 2π(1²) = 7π = 7*3.14 ≈ 22 cm²
simplify by using the distributive property and then combine like terms:
4 (3x – 9)
ANSWER PLS
Answer:
12x - 36
Step-by-step explanation:
4 (3x – 9)
Distribute
4 *3x - 4*9
12x - 36
[tex]\huge\text{Hey there!}[/tex]
[tex]\huge\text{4(3x - 9)}[/tex]
[tex]\huge\text{= 4(3x) + 4(-9)}[/tex]
[tex]\huge\text{= 12x - 36}[/tex]
[tex]\huge\boxed{\textsf{Answer: 12x - 36}}\huge\checkmark[/tex]
[tex]\large\textsf{Good luck on your assignment \& enjoy your assignment!}[/tex]
~[tex]\huge\boxed{\frak{Amphitrite1040:)}}[/tex]
How do you complete the square of x2+8x+26?
Answer:
see below
Step-by-step explanation:
x^2+8x+26
Take the coefficient of the x term
8
Divide by 2
8/2 = 4
square it
4^2 =16
we need to add 16 to 26 = 16+10
x^2 + 8x+16 +10
(x+4)^2 +10
The answer you are looking for is (x+4)²+10.
Solution/Explanation:
Selecting the "x" term's coefficient,
It would be 8.
Now, dividing it by 2,
8/2=4.
Squaring 4,
4²=16.
So, now, since (x+4)²=x²+8x+16, you must solve for 26-16, which equals 10, which you would supplement into the equation.
So, therefore, (x+4)²+10.
I hope this has helped you. Enjoy your day.
Sydney has finished all his work on time, but many of his teammates are still struggling to complete their assignments. What should he do? a) Not distract them; they may get farther behind. O b) Listen to them complain about their workloads O c) Help them complete their work d) Share his thoughts on how they could get their work done faster
Answer:
I think the correct option is c
Answer:
I think the correct answer is (d)
Step-by-step explanation:
if he shares his thoughts on how they could get their work done faster like using an app like this, then it would be of great help to them
if a circumference of a circle is 22cm.find it diameter take pie 22/7.
Answer:
➕
Step-by-step explanation:
i know the answer ok it is easy
what is the aswer to 5 is 2 more than?
Answer:
Cuz 5 is greater than 2
Step-by-step explanation:
Answer:
3
Step-by-step explanation:
Let f(x)=−5x+18 and g(x)=x2+15.
Find f(−2)−g(−2).
Answer:
21
Step-by-step explanation:
-5(-2)-(-2)²+15
10-(4)+15
10-4+15
21
Answer:
9
Step-by-step explanation:
f(x)=−5x+18
f(-2) = -5(-2)+18 = 10+18 = 28
g(x)=x^2+15
g(-2) = (-2)^2 +15 = 4+15 = 19
f(02) - g(-2) = 28 - 19 = 9
AABC is reflected across the x-axis and then translated 4 units up to create AA'BC. What are the coordinates of the vertices of AABC?
Length of a line segment with endpoints (3,-2) and (-3,4).
Answer:
6squareroot2
Step-by-step explanation:
that's the answer I think
the guys is wrong i checked
Step-by-step explanation:
the guys is wrong i checked
 evaluate P(6,2) or 6p2
Answer:
30
Step-by-step explanation:
Permutation equation: [tex]\frac{n!}{(n-r)!}[/tex]
n = Total number of objects, r = Number of objects selected
[tex]_6P_2=\frac{6!}{(6-2)!}=30[/tex]
the area of a rectangular park is 7/8 sqaure mile. the length of the park is 3/4 mile. what is the width of the park?
Answer:
7/6
Step-by-step explanation:
since the formula of area is length times width,you have to divide the area by the length to find the width
area=length×width
the width will be
width=area÷length
=7/8÷3/4
7/8×4/3
7/2×1/3
7/6
that's the width you can prove it by multiplying the length times the width to see if you will get 7/8..
I hope this helps
PLEASE ANSWER
Triangle ABC is similar to triangle DEF. find the length of median CP
A. 12
B. 16
C. 24
D.48
12/16 = (3x-12)/(2x+8)
16(3x-12)=12(2x+8)
48x-192=24x+96
48x-24x=192+96
24x=288
X=288/24
X=12
3x-12
=(12x3)-12
=36-12
=24
C is the answer
Hope this helps!
Answer:
48
Step-by-step explanation:
2x+8=3x-12(ABCP ~FDQE)
2x-3x= -8-12
-x= -20
x=20
now,
CP=3x-12
3*20-12
48
Salaries of entry-level computer engineers have Normal distribution with unknown mean and variance. Three randomly selected computer engineers have following salaries (in $1000s): 70, 80, 90. The average and the standard deviation of the data in the sample are 80 and 10. Using hypothesis testing, determine if this sample provides a sufficient evidence, at a 10% level of significance, that the average salary of all entry-level computer engineers is different from $60,000.
a. Null hypothesis.
b. alternative hypothesis.
c. test statistic.
d. acceptance region.
Answer:
H0 : μ = 60000
H1 : μ ≠ 60000
Test statistic = 3.464
Step-by-step explanation:
Given :
Sample mean salary, xbar = 80000
Sample standard deviation, s = 10000
Population mean salary , μ = 60000
Sample size, n = 3
Hypothesis :
H0 : μ = 60000
H1 : μ ≠ 60000
The test statistic :
T = (xbar - μ) ÷ (s/√(n))
T = (80000 - 60000) ÷ (10000/√(3))
T = 20000 / 5773.5026
T = 3.464
The Decison region :
If Tstatistic >Tcritical
Tcritical at 10%, df = 2 ; two - tailed = 2.9199
Tstatistic > Tcritical ; He
What is the slope of a line perpendicular to line A?
look at the image below
Answer:
201.1 km²
Step-by-step explanation:
Surface area of the figure,
4πr²
= 4×π×4²
= 64π
= 201.1 km² (rounded to the nearest tenth)
Mariah owed her grandfather 52.25 but was recently able to pay him back $1.50. How much does Mariah currently
owe her grandfather?
Answer:
52.25 - 1.50 = 50.75
Step-by-step explanation:
I'd recommend using a calculator or pencil and paper
53.25
- 1.50
--------
50.75
What are the slope and the y-intercept of the linear function that is represented by the graph?