Answer:
Microsoft Word 2010 belongs to the Microsoft Office 2010 suite.
Explanation:
Microsoft Word 2010 was released as part of the Microsoft Office 2010 suite, which was launched in June 2010. The suite included various applications such as Word, Excel, PowerPoint, Outlook, and others. Microsoft Word 2010 specifically is a word processing software designed to create and edit text-based documents. It introduced several new features and improvements compared to its predecessor, Word 2007. These enhancements included an improved user interface, enhanced collaboration tools, new formatting options, an improved navigation pane, and improved graphics capabilities. Therefore, Microsoft Word 2010 is part of the Microsoft Office 2010 family of software applications.
Which development approach was used in the article, "Protecting American Soldiers: The Development, Testing, and Fielding of the Enhanced Combat Helmet"? Predictive, adaptive or Hybrid
The sequential and predetermined plan known as the waterfall model is referred to as the predictive approach.
What is the development approachThe process entails collecting initial requirements, crafting a thorough strategy, and implementing it sequentially, with minimal flexibility for modifications after commencing development.
An approach that is adaptable, also referred to as agile or iterative, prioritizes flexibility and cooperation. This acknowledges that needs and preferences can evolve with time, and stresses the importance of being flexible and reactive to those alterations.
Learn more about development approach from
https://brainly.com/question/4326945
#SPJ1
The development approach that was used in the article "Protecting American Soldiers: The Development, Testing, and Fielding of the Enhanced Combat Helmet" is Hybrid approach. (Option C)
How is this so?The article "Protecting American Soldiers: The Development, Testing, and Fielding of the Enhanced Combat Helmet" utilizes a hybrid development approach,combining aspects of both predictive and adaptive methods.
Predictive development involves predefined planning and execution, suitable for stable projects,while adaptive methods allow for flexibility in adapting to changing requirements and environments.
Learn more about development approach at:
https://brainly.com/question/4326945
#SPJ1