Answer:
yes you can do that it's utter logic
Answer:
Yes.
Explanation:
Itunes gift cards do buy you games/movies/In app purchases/ect.
6 things you should consider when planning a PowerPoint Presentation.
Answer: I would suggest you consider your audience and how you can connect to them. Is your presentation, well, presentable? Is whatever you're presenting reliable and true? Also, no more than 6 lines on each slide. Use colors that contrast and compliment. Images, use images. That pulls whoever you are presenting to more into your presentation.
Explanation:
(TCO 4) Give the contents of Register A after the execution of the following instructions:
Data_1 EQU $12
Data_2 EQU %01010101
LDAA #Data_1
ADDA #Data_2
A) $12
B) $67
C) $55
D) $57
Dave owns a construction business and is in the process of buying a laptop. He is looking for a laptop with a hard drive that will likely continue to function if the computer is dropped. Which type of hard drive does he need?
Answer:
Solid state drive
Explanation:
The term solid-state drive is used for the electronic circuitry made entirely from semiconductors. This highlights the fact that the main storage form, in terms of a solid-state drive, is via semiconductors instead of a magnetic media for example a hard disk. In lieu of a more conventional hard drive, SSD is built to live inside the device. SSDs are usually more resistant to physical shock in comparison to the electro-mechanical drives and it functions quietly and has faster response time. Therefore, SSD will be best suitable for the Dave.
Describe the Software Development Life Cycle. Describe for each phase of the SDLC how it can be used to create software for an Employee Payroll System that allows employees to log the number of hours completed in a work period and then generate their pay. Use Microsoft Word to complete this part of the assessment. Save your file as LASTNAME FIRSTNAME M08FINAL1 were LASTNAME is your lastname and FIRSTNAME is your first name. Upload your answer to this question; do not submit this assessment until you have completed all questions. This question is worth 25 points.
Answer:
Check the explanation
Explanation:
SDLC
SDLC stands for Software Development Life Cycle
It provides steps for developing a software product
It also checks for the quality and correctness of a software
The main aim of SDLC is to develop a software, which meets a customer requirements
SDLC involves various phases to develop a high-quality product for its end user
Phases of SDLC
There are seven phases in a software development life cycle as follows,
Requirement Analysis Feasibility Study Design Coding Testing Deployment Maintenance
kindly check the attached image below
Requirement analysis
This is the first stage in a SDLC.
In this phase, a detailed and precise requirements are collected from various teams by senior team members
It gives a clear idea of the entire project scope, opportunities and upcoming issues in a project
This phase also involves, planning assurance requirements and analyze risk involved in the project
Here, the timeline to finish the project is finalized
Feasibility Study
In this stage, the SRS document, that is “Software Requirement Specification” document is defined, which includes everything to be designed and developed during the life cycle of a project
Design
In this phase as the name indicates, software and system design documents are prepared, based on the requirement specification document
This enable us to define the whole system architecture
Two types of design documents are prepared in this phase as follows,
High-Level Design
Low-Level Design
Coding
In this phase, the coding of project is done in a selected programming language
Tasks are divided into many units and given to various developers
It is the longest phase in the SDLC
Testing
In this stage, the developed coding is tested by the testing team
The testing team, checks the coding in the user point of view
Installation/Deployment
In this stage, a product is released by the company to the client
Maintenance
Once the product is delivered to the client, the maintenance phase work will start by fixing errors, modifying and enhancing the product.
Employee Payroll System
Requirement analysis
Gather information from various team for requirement
Analyze the number of employees to handle the project
Timeline to finish the project, eg.1 month
Feasibility Study
The system requirements such as how many systems are required
Decide which software to be installed to handle the project.
For example, if we are going to develop the software using C language, then software for that has to be installed
The SRS document has to be prepared
Design
In this the HLD and LLD is prepared, the overall software architecture is prepared
The modules involved in coding are decided
Here the modules can be employee, payroll manager, Employee Log time, account details
The input and output are designed, such as employee name is the input and output is the salary for him, based on working hours
Coding
Here the coding is divided into various sections and given to 2 or more employees
One may code employee detail, one will code working hours of employees and one may code the banking details of employee
Testing
The coding is tested for syntax, declaration, data types and various kinds of error
The testing team will test the coding with various possible values
They may even check with wrong values and analyze the output for that
Installation
Now the software is installed in the client system and the client is calculating the payroll for an employee based on working hours in a month
Maintenance
If any error occurs, the team will clear the issue.
When a new employee joins, then the employee data will added to the database and the database is updated
Also if the client asks for any new features, it will done in this phase.
D-H public key exchange Please calculate the key for both Alice and Bob.
Alice Public area Bob
Alice and Bob publicly agree to make
N = 50, P = 41
Alice chooses her Bob
picks his
Private # A = 19 private #
B= ?
------------------------------------------------------------------------------------------------------------------------------------------
I am on Alice site, I choose my private # A = 19.
You are on Bob site, you pick up the private B, B and N should have no common factor, except 1.
(Suggest to choose B as a prime #) Please calculate all the steps, and find the key made by Alice and Bob.
The ppt file of D-H cryptography is uploaded. You can follow the steps listed in the ppt file.
Show all steps.
Answer:
See explaination
Explanation:
Please kindly check attachment for the step by step solution of the given problem.
The equation of certain traveling waves is y(x.t) = 0.0450 sin(25.12x - 37.68t-0.523) where x and y are in
meters, and t in seconds. Determine the following:
(a) Amplitude. (b) wave number (C) wavelength. (d) angular frequency. (e) frequency: (1) phase angle, (g) the
wave propagation speed, (b) the expression for the medium's particles velocity as the waves pass by them, and (i)
the velocity of a particle that is at x=3.50m from the origin at t=21.os
Answer:
A. 0.0450
B. 4
C. 0.25
D. 37.68
E. 6Hz
F. -0.523
G. 1.5m/s
H. vy = ∂y/∂t = 0.045(-37.68) cos (25.12x - 37.68t - 0.523)
I. -1.67m/s.
Explanation:
Given the equation:
y(x,t) = 0.0450 sin(25.12x - 37.68t-0.523)
Standard wave equation:
y(x, t)=Asin(kx−ωt+ϕ)
a.) Amplitude = 0.0450
b.) Wave number = 1/ λ
λ=2π/k
From the equation k = 25.12
Wavelength(λ ) = 2π/25.12 = 0.25
Wave number (1/0.25) = 4
c.) Wavelength(λ ) = 2π/25.12 = 0.25
d.) Angular frequency(ω)
ωt = 37.68t
ω = 37.68
E.) Frequency (f)
ω = 2πf
f = ω/2π
f = 37.68/6.28
f = 6Hz
f.) Phase angle(ϕ) = -0.523
g.) Wave propagation speed :
ω/k=37.68/25.12=1.5m/s
h.) vy = ∂y/∂t = 0.045(-37.68) cos (25.12x - 37.68t - 0.523)
(i) vy(3.5m, 21s) = 0.045(-37.68) cos (25.12*3.5-37.68*21-0.523) = -1.67m/s.
Rewrite this if/else if code segment into a switch statement int num = 0; int a = 10, b = 20, c = 20, d = 30, x = 40; if (num > 101 && num <= 105) { a += 1; } else if (num == 208) { b += 1; x = 8; } else if (num > 208 && num < 210) { c = c * 3; } else { d += 1004; }
Answer:
public class SwitchCase {
public static void main(String[] args) {
int num = 0;
int a = 10, b = 20, c = 20, d = 30, x = 40;
switch (num){
case 102: a += 1;
case 103: a += 1;
case 104: a += 1;
case 105: a += 1;
break;
case 208: b += 1; x = 8;
break;
case 209: c = c * 3;
case 210: c = c * 3;
break;
default: d += 1004;
}
}
}
Explanation:
Given above is the equivalent code using Switch case in JavaThe switch case test multiple levels of conditions and can easily replace the uses of several if....elseif.....else statements.When using a switch, each condition is treated as a separate case followed by a full colon and the the statement to execute if the case is true.The default statement handles the final else when all the other coditions are false