30% percent of the students passed both Mathematics and English.
What is Percentage?A rate, number, or amount in each hundred is known as a percentage
Let's use a Venn diagram to represent the information given in the problem. Let M be the set of students who passed Mathematics, E be the set of students who passed English, and F be the set of students who failed both.
We know that there are 40 students in the class, and 90% passed Mathematics, so the number of students who passed Mathematics is 0.9 × 40 = 36. Similarly, 75% passed English, so the number of students who passed English is 0.75 × 40 = 30.
We also know that 2 students failed both Mathematics and English, so we can label the F section with 2.
where the number in each section represents the number of students who passed the respective exam.
To find the percentage of students who passed both examinations (i.e., the intersection of M and E), we need to add the number of students in the M and E intersection to the F section, then subtract that from the total number of students (40), and finally divide by 40 to get the percentage. That is:
percentage of students who passed both exams = (M ∩ E + F) / 40 × 100%
= (28 + 2) / 40 × 100%
= 30%
Therefore, 30% of the students passed both Mathematics and English.
To learn more about Percentage, click on the link:
https://brainly.com/question/24877689
#SPJ1
A.14.5 square inches
B.29 square inches
c.20.5 square inches
d.32 square inches
Answer:
d. 32 in.²
Step-by-step explanation:
Bottom face: 6 in. × 0.5 inch
Side faces: 2 × 5 in. × 0.5 in.
Front and back faces: 2 x 6 in. × 4 in. / 2
surface area = 3 in.² + 5 in.² + 24 in.²
surface area = 32 in.²
If 140 men working 10 hours a day can build a house in 16 days, find out how many men will build same kind of house in 12 days by working 13 hours a day?
We need 144 men to build the house in 12 days working 13 hours a day.
Let M be the number of men needed to build the house in 12 days working 13 hours a day.
140 x 10 x 16 = M x 13 x 12
Simplifying the equation, we get:
22400 = 156M
Dividing both sides by 156, we get:
M = 144.1
An equation in mathematics is a statement that two expressions are equal. It consists of two sides, the left-hand side (LHS) and the right-hand side (RHS), separated by an equal sign (=). The expressions on either side can be numbers, variables, or combinations of both. The equation expresses that the values of the expressions on both sides are equivalent.
Equations play a fundamental role in many areas of mathematics and are used to model various real-world situations, such as physics, engineering, and finance. They can be solved using various techniques, such as substitution, elimination, or graphing, to find the values of the variables that satisfy the equation.
To learn more about Equation visit here:
brainly.com/question/29538993
#SPJ4
Samuel bought four adult tickets to a movie for $48. Erica bought 3 adult tickets to a movie at a different theater. Erica paid $2.50 more than Samuel for each movie ticket she bought. How much did Erica spend on her movie ticket purchase?
Answer: £43.50
Step-by-step explanation:
each ticket from samuel is £12 if erica is spending £2.50 more per ticket that is £14.50 per ticket. £14.50 x 3 = £43.50
Dakota earned $6.00 in interest in Account A and 30.00$ in interest in Account B after months. If the simple interest rate is 4% for Account A and 5% for Account B, which account has the greater principal? Explain.
the principal in Account B is 4.8 times the principal in Account A.
How to solve?
Let the principal in Account A be P and the principal in Account B be Q. Also, let n be the number of months.
From the given information, we have:
Interest earned in Account A = $6.00
Interest rate in Account A = 4%
Number of months = n
Using the formula for simple interest, we have:
Interest earned in Account A = (P × 4%× n) / 12
Substituting the given values, we get:
6.00 = (P × 4% × n) / 12
P× n = 150
Similarly, we have:
Interest earned in Account B = $30.00
Interest rate in Account B = 5%
Number of months = n
Using the formula for simple interest, we have:
Interest earned in Account B = (Q× 5% × n) / 12
Substituting the given values, we get:
30.00 = (Q× 5% ×n) / 12
Q × n = 720
To compare the principals, we can divide the equation for Account B by the equation for Account A:
(Q × n) / (P× n) = 720 / 150
Simplifying, we get:
Q / P = 4.8
Therefore, the principal in Account B is 4.8 times the principal in Account A.
Since the interest rate in Account B is higher than the interest rate in Account A, we can conclude that the principal in Account B is greater than the principal in Account A.
To know more about Simple Interest visit:
https://brainly.com/question/25845758
#SPJ1
The probability distribution of the amount of memory X (GB) in a purchased flash drive is given below. x 1 2 4 8 16 p(x) .05 .10 .35 .40.10 Compute the following: E(X), E(X2), V(X), E(3x + 2), E (3X² + 2), V (3x + 2), E(X +1), V(X + 1).
To solve the question asked, you can say: Therefore, the final answers expressions are: E(X) = 5.8; E(X²) = 59.8; V(X) = 21.16 and E(3X + 2) = 20.4
what is expression ?In mathematics, an expression is a set of numbers, variables, and mathematical operations such as addition, subtraction, multiplication, division, and exponentiation that represent quantities or values. Expressions can be as simple as "3 + 4" or as complex as they can contain functions like "sin(x)" or "log(y)" . Expressions can be evaluated by substituting values for variables and performing mathematical operations in the order specified. For example, if x = 2, the expression "3x + 5" is 3(2) + 5 = 11. In mathematics, formulas are often used to describe real-world situations, create equations, and simplify complex math problems.
To calculate these values, we first need to compute the mean (expected value) and variance of X, which are given by:
E(X) = ∑[x * p(x)]
= 1 * 0.05 + 2 * 0.10 + 4 * 0.35 + 8 * 0.40 + 16 * 0.10
= 5.8
E(X²) = ∑[x² * p(x)]
= 1² * 0.05 + 2² * 0.10 + 4² * 0.35 + 8² * 0.40 + 16² * 0.10
= 59.8
V(X) = E(X²) - [E(X)]²
= 59.8 - 5.8²
= 21.16
E(3X + 2) = 3E(X) + 2
= 3(5.8) + 2
= 20.4
E(3X² + 2) = 3E(X²) + 2
= 3(59.8) + 2
= 179.4
V(3X + 2) = V(3X)
= 9V(X)
= 9(21.16)
= 190.44
E(X + 1) = E(X) + 1
= 5.8 + 1
= 6.8
V(X + 1) = V(X)
= 21.16
Therefore, the final answers are:
E(X) = 5.8
E(X²) = 59.8
V(X) = 21.16
E(3X + 2) = 20.4
E(3X² + 2) = 179.4
V(3X + 2) = 190.44
E(X + 1) = 6.8
V(X + 1) = 21.16
To know more about expressions visit :-
https://brainly.com/question/14083225
#SPJ1
1(1/2)= 1 1/2 draw number line and represent this
|-----|-----|-----|----|-----|-----|--│--|-----|----|-----|
-5 -4 -3 -2 -1 0 1 │ 2 3 4 5
1 1/2
On this number line, the tick mark labeled "1 1/2" is located halfway between the integer values of 1 and 2.
To represent the number 1 1/2 on a number line, we need to draw a horizontal line with evenly spaced tick marks. Each tick mark represents a specific value on the number line. Since 1 1/2 is a mixed number that includes a whole number (1) and a fraction (1/2), we need to locate it between the integer values of 1 and 2. The tick mark for 1 1/2 should be halfway between these two integers, which means it would be located at the midpoint of the line segment that connects the tick marks for 1 and 2. By placing the tick mark for 1 1/2 in the correct position on the number line, we can accurately represent this number visually.
Learn more about the number line: brainly.com/question/16191404
#SPJ4
Reduce each expression to a polynomial
((y-b)^(2))/(y-b+1)+(y-b)/(y-b+1)
The given expression ((y-b)²/(y-b+1)+(y-b)/(y-b+1) after being reduced to a polynomial, can be represented as y-b.
In order to reduce the given equation to a polynomial, we are required to simplify and combine like terms. First, we can simplify the expression in the numerator by expanding the square:
((y-b)²/(y-b+1) = (y-b)(y-b)/(y-b+1) = (y-b)²/(y-b+1)
Now, we can combine the two terms in the equation by finding a common denominator:
(y-b)²/(y-b+1) + (y-b)/(y-b+1) = [(y-b)² + (y-b)]/(y-b+1)
Next, we can combine the terms in the numerator by factoring out (y-b):
[(y-b)² + (y-b)]/(y-b+1) = (y-b)(y-b+1)/(y-b+1)
Finally, we can cancel out the common factor of (y-b+1) in the numerator and denominator to get the polynomial:
(y-b)(y-b+1)/(y-b+1) = y-b
Therefore, the equation ((y-b)²)/(y-b+1)+(y-b)/(y-b+1) after being simplified, is equivalent to the polynomial y-b.
Learn more about polynomials :
https://brainly.com/question/30127172
#SPJ4
Suppose the number of water people drink in a week is normally distributed with a mean of 50 and a standard deviation of 5 glasses of water. Find the value 1 standard deviation below the mean
Answer:
Step-by-step explanation:
.
What is 0.83333333333 as a fraction?
Answer: 41666666669 / 50000000003
Step-by-step explanation:
round 0.956 to one decimal place
Answer: 0.96
Step-by-step explanation:
To round 0.956 to one decimal place, we need to look at the second decimal place (the hundredths place), which is 5. Since 5 is greater than or equal to 5, we need to round up the first decimal place (the tenths place), which is 9. Therefore, the rounded number to one decimal place is:
0.956 rounded to one decimal place = 0.96
Write the equation of a line that is perpendicular to y=½x - 9 and passes through the point (3, -2).
Answer:
y = - 2x + 4
Step-by-step explanation:
the equation of a line in slope- intercept form is
y = mx + c ( m is the slope and c the y- intercept )
y = [tex]\frac{1}{2}[/tex] x - 9 ← is in slope- intercept form
with slope m = [tex]\frac{1}{2}[/tex]
given a line with slope m then the slope of a line perpendicular to it is
[tex]m_{perpendicular}[/tex] = - [tex]\frac{1}{m}[/tex] = - [tex]\frac{1}{\frac{1}{2} }[/tex] = - 2 , then
y = - 2x + c ← is the partial equation
to find c substitute (3, - 2 ) into the partial equation
- 2 = - 2(3) + c = - 6 + c ( add 6 to both sides )
4 = c
y = - 2x + 4 ← equation of perpendicular line
A package is delivered 3 hours 25 minutes after it is collected, it is collected at 15:39
at what time is the package delivered
Given the data in the question we calculate that the package is delivered at 18:44.
If the package is collected at 15:39 and delivered 3 hours and 25 minutes later, we can add that amount of time to the collection time to find the delivery time.
First, we need to convert 3 hours and 25 minutes to just minutes. To do this, we multiply 3 by 60 (to convert hours to minutes) and then add 25:
3 hours and 25 minutes = (3 × 60) + 25 = 185 minutes
Now we can add 185 minutes to the collection time of 15:39:
15:39 + 185 minutes = 18:44
Therefore, the package is delivered at 18:44. The delivery time of a package is the time it takes for the package to be transported from the sender to the receiver. In this case, the package was collected at 15:39 and delivered 3 hours and 25 minutes later. To find the delivery time, we added the duration of 3 hours and 25 minutes to the collection time. It is important to keep track of delivery times to ensure timely and efficient shipping, especially for time-sensitive or perishable items. Timely delivery is crucial for businesses that rely on shipping to meet customer expectations and maintain customer satisfaction.
To learn more about amount of time click here
brainly.com/question/29823316
#SPJ4
when calculating confidence intervals in this class the product of a constant times a margin of error is added and subtracted to what value to obtain the ci range? group of answer choices mean standard deviation alpha median
The confidence interval is calculated by adding and subtracting the product of a constant (usually 1.96), the margin of error, and the mean.
The constant times the margin of error is added and subtracted from the sample mean to obtain the confidence interval range.
A standard deviation (or σ) is a measure of how dispersed the data is in relation to the mean.
A low standard deviation means data are clustered around the mean, and a high standard deviation indicates data are more spread out.
The constant is determined by the confidence level of your analysis (typically 95%) and the margin of error is determined by the standard deviation and the size of your sample.
To learn more about “standard deviation” refer to the https://brainly.com/question/475676
#SPJ11
how many yard are in 10 meters
Answer:
10.936 yards
Step-by-step explanation:
how to check 2(a+3)=-12
Answer:
a = -9
Step-by-step explanation:
2(a+3) = -12
2a + 6 = -12
2a = -18
a = -9
Let's Check
2(-9 + 3) = -12
2(-6) = -12
-12 = -12
So, a = -9 is the correct answer.
At which values in the interval [0, 2π) will the functions f (x) = 2cos2θ and g(x) = −1 − 4cos θ − 2cos2θ intersect?
a: theta equals pi over 3 comma 4 times pi over 3
b: theta equals pi over 3 comma 5 times pi over 3
c: theta equals 2 times pi over 3 comma 4 times pi over 3
d: theta equals 2 times pi over 3 comma 5 times pi over 3
The values in the interval [0, 2π) for which the two points would intersect as required is; Choice C; theta equals 2 times pi over 3 comma 4 times pi over 3.
What values of θ make the two functions intersect?Recall from the task content; the given functions are;
f (x) = 2cos2θ and g(x) = −1 − 4cos θ − 2cos2θ
Therefore, for intersection; f (θ) and g(θ):
2 cos²θ = −1 − 4cos θ − 2cos²θ
4cos²θ + 4cosθ + 1 = 0
let cos θ = y;
4y² + 4y + 1 = 0
y = -1/2
Therefore; -1/2 = cos θ
θ = cos-¹ (-1/2)
θ = 2π/3, 4π/3.
Ultimately, the correct answer choice is; Choice C; theta equals 2 times pi over 3 comma 4 times pi over 3.
Read more on trigonometry;
https://brainly.com/question/24334139
#SPJ1
If a first sample has a sample variance of 12 and a second sample has a sample variance of 22 , which of the following could be the value of the pooled sample variance? 1 10 16 25
The value of the pooled sample variance is 25 when the first sample has a sample variance of 12 and a second sample has a sample variance of 22.
If a first sample has a sample variance of 12 and a second sample has a sample variance of 22, then the possible values of the pooled sample variance are given by the formula below:
Formula:
pooled sample variance = [(n₁ - 1) s₁² + (n₂ - 1) s₂²] / (n₁ + n₂ - 2)
Where s₁ and s₂ are the sample standard deviations of the first and second samples,
n₁ and n₂ are the sample sizes of the first and second samples, respectively.
Thus, substituting the given values into the formula above, we have pooled sample variance:
= [(n₁ - 1) s₁² + (n₂ - 1) s₂²] / (n₁ + n₂ - 2)
= [(n₁ - 1) 12 + (n₂ - 1) 22] / (n₁ + n₂ - 2)
Checking each of the answer options:
If pooled sample variance is 1, then:
(n₁ - 1) 12 + (n₂ - 1) 22
= (n₁ + n₂ - 2)(1)
= 12n₁ + 22n₂ - 34
= (12n₁ - 12) + (22n₂ - 22)
= 12(n₁ - 1) + 22(n₂ - 1)
The expression on the right-hand side of the equation is a sum of multiples of 12 and 22, and therefore, the expression itself will be a multiple of the greatest common divisor of 12 and 22, which is 2.
Since 34 is not a multiple of 2, the equation cannot be true if the pooled sample variance is 1.
Thus, 1 is not a possible value of the pooled sample variance.
If pooled sample variance is 10, then:
(n₁ - 1) 12 + (n₂ - 1) 22
= (n₁ + n₂ - 2)(10)
= 12n₁ + 22n₂ - 34
= (12n₁ - 12) + (22n₂ - 22)
= 12(n₁ - 1) + 22(n₂ - 1)
The expression on the right-hand side of the equation is a sum of multiples of 12 and 22, and therefore, the expression itself will be a multiple of the greatest common divisor of 12 and 22, which is 2.
Since 34 is not a multiple of 2, the equation cannot be true if the pooled sample variance is 10.
Thus, 10 is not a possible value of the pooled sample variance.
If pooled sample variance is 16, then:
(n₁ - 1) 12 + (n₂ - 1) 22
= (n₁ + n₂ - 2)(16)
= 12n₁ + 22n₂ - 34
= (12n₁ - 12) + (22n₂ - 22)
= 12(n₁ - 1) + 22(n₂ - 1)
The expression on the right-hand side of the equation is a sum of multiples of 12 and 22, and therefore, the expression itself will be a multiple of the greatest common divisor of 12 and 22, which is 2.
Since 34 is not a multiple of 2, the equation cannot be true if the pooled sample variance is 16.
Thus, 16 is not a possible value of the pooled sample variance.
If pooled sample variance is 25, then:
(n₁ - 1) 12 + (n₂ - 1) 22
= (n₁ + n₂ - 2)(25)
= 12n₁ + 22n₂ - 34
= (12n₁ - 12) + (22n₂ - 22)
= 12(n₁ - 1) + 22(n₂ - 1)
The expression on the right-hand side of the equation is a sum of multiples of 12 and 22, and therefore, the expression itself will be a multiple of the greatest common divisor of 12 and 22, which is 2.
Since 46 is a multiple of 2, the equation can be true if the pooled sample variance is 25.
Thus, 25 is a possible value of the pooled sample variance.
Learn more about sample variance here:
brainly.com/question/29077187
#SPJ11
find the derivative of y equals 5 x squared sec to the power of short dash 1 end exponent (2 x minus 3 )
The derivative of the given function [tex]y = 5x^2 sec^{(-1)(2x-3)^2}[/tex] is [tex]dy/dx=-20x\sqrt{((2x-3)^2-1)}[/tex]
It can be derived as:
We can use the chain rule and the derivative of [tex]sec^{(-1)x}[/tex] which is [tex]-1/(x*\sqrt{(x^2-1)})[/tex]
First, we apply the chain rule to the function.
Let [tex]u = (2x-3)^2[/tex], then:
[tex]y = 5x^2 sec^{(-1)u}[/tex]
[tex]dy/dx = d/dx [5x^2 sec^{(-1)u}][/tex]
[tex]dy/dx = d/dx [5x^2 sec^{(-1)[(2x-3)^2]}][/tex]
[tex]dy/dx= 5x^2 d/dx[sec^{(-1)u}][/tex] (Using the chain rule)
Now, let [tex]v = u^{(1/2)} = (2x-3)[/tex].
Then:
[tex]dy/dx = 5x^2 d/dv [sec^{(-1)v}] dv/dx[/tex] (Using the chain rule again)
We have:
[tex]d/dv [sec^{(-1)v}] = -1/(v*\sqrt{(v^2-1)}) = -1/[(2x-3)*\sqrt{((2x-3)^2-1)}][/tex]
Also, [tex]dv/dx = 2[/tex]
Substituting these back into the equation:
[tex]dy/dx = 5x^2 d/dv [sec^{(-1)v}] dv/dx[/tex]
[tex]dy/dx= 5x^2 (-1/[(2x-3)*\sqrt{((2x-3)^2-1)}] (2)[/tex]
Simplifying this expression gives:
[tex]dy/dx = -20x (2x-3)/[(2x-3)*\sqrt{((2x-3)^2-1)}][/tex]
[tex]dy/dx = -20x\sqrt{((2x-3)^2-1)}[/tex]
Therefore, the derivative of y with respect to x is:
[tex]dy/dx = -20x\sqrt{((2x-3)^2-1)}[/tex]
To practice more questions about derivative:
https://brainly.com/question/12047216
#SPJ11
Please help!
The object above is symmetrical through Z. If Y = 11 inches, Z = 13 inches, and H = 6 inches, what is the area of the object?
A. 6.5 square inches
B. 78 square inches
C. 31 square inches
D. 156 square inches
the correct area of the symmetrical object is option (B). 78 square inches.
Definition of SymmetryIf two more identical parts can be separated from a form and arranged in an orderly fashion, the shape is said to be symmetrical. For instance, when you are instructed to cut out a "heart" from a sheet of paper, all you need to do is fold the paper, draw one-half of the heart at the fold, and then cut it out. After you do this, you will discover that the second half precisely matches the first half.
In the first part of the object
Area of the object=½×H×Z
=½×13×6
=39 square inches
Given that object above is symmetrical through Z.
So, the area of 2nd part of object will also be 39 square inches
Hence total area is 78 square inches.
to know more about area, visit:
https://brainly.com/question
#SPJ1
first 6 terms of n² + 7
Answer:
8, 11, 16, 23, 32, and 43.
Step-by-step explanation:
When n = 1:
n² + 7 = 1² + 7 = 8
When n = 2:
n² + 7 = 2² + 7 = 11
When n = 3:
n² + 7 = 3² + 7 = 16
When n = 4:
n² + 7 = 4² + 7 = 23
When n = 5:
n² + 7 = 5² + 7 = 32
When n = 6:
n² + 7 = 6² + 7 = 43
Therefore, the first 6 terms of n² + 7 are 8, 11, 16, 23, 32, and 43.
Answer:
When n = 1, n² + 7 = 1² + 7 = 8
When n = 2, n² + 7 = 2² + 7 = 11
When n = 3, n² + 7 = 3² + 7 = 16
When n = 4, n² + 7 = 4² + 7 = 23
When n = 5, n² + 7 = 5² + 7 = 32
When n = 6, n² + 7 = 6² + 7 = 43
The first 6 terms of n² + 7 are 8, 11, 16, 23, 32, and 43.
Step-by-step explanation:
ᓚᘏᗢ
hope u have a good day man
Select the correct solution for the expression. 2 5 + 3 8 2 5 + 3 8 A. 2 5 + 3 8 = 5 13 2 5 + 3 8 = 5 13 B. 16 40 + 15 40 = 31 40 16 40 + 15 40 = 31 40 C. 10 40 + 24 40 = 34 40 10 40 + 24 40 = 34 40 D. 2 5 + 3 8 = 6 40
In response to the stated question, we may state that As a result, the equation proper answer is: B. 16/40 + 15/40 = 31/40
What is equation?An equation in mathematics is a statement that states the equality of two expressions. An equation is made up of two sides that are separated by an algebraic equation (=). For example, the argument "2x + 3 = 9" asserts that the phrase "2x + 3" equals the number "9". The purpose of equation solving is to determine the value or values of the variable(s) that will allow the equation to be true. Equations can be simple or complicated, regular or nonlinear, and include one or more elements. In the equation "x2 + 2x - 3 = 0," for example, the variable x is raised to the second power. Lines are utilised in many different areas of mathematics, such as algebra, calculus, and geometry.
We must identify a common denominator for the two fractions in order to solve the formula 2/5 + 3/8. Because 40 is the lowest common multiple of 5 and 8, we can transform both fractions to have a denominator of 40:
2/5 = 16/40
3/8 = 15/40
We can now sum the two fractions:
16/40 + 15/40 = 31/40
As a result, the proper answer is:
B. 16/40 + 15/40 = 31/40
To know more about equation visit:
https://brainly.com/question/649785
#SPJ1
a ball is dropped from a height of 6 ft. assuming that on each bounce, the ball rebounds to one-third of its previous height, find the total distance traveled by the ball.
A ball is dropped from a height of 6 ft. assuming that on each bounce, the ball rebounds to one-third of its previous height, the total distance traveled by the ball is approximately 11.926 feet.
How do we calculate the total distance?We have to calculate the distance traveled by the ball with the help of the given data, as shown below;The first height of the ball is 6 feet. Distance traveled by the ball at the first instance = 6 feet.The ball rebounds to one-third of its previous height, and the ball goes to a height of:6/3 = 2 feet.
Distance traveled by the ball after the first bounce = 6 + 2 + 2 = 10 feet.The ball rebounds again to one-third of its previous height, and the ball goes to a height of:2/3 = 0.6667 feet. Distance traveled by the ball after the second bounce = 10 + 0.6667 + 0.6667 = 11.3334 feet.
The ball rebounds again to one-third of its previous height, and the ball goes to a height of:0.6667/3 = 0.2222 feet. Distance traveled by the ball after the third bounce = 11.3334 + 0.2222 + 0.2222 = 11.7778 feet. The ball rebounds again to one-third of its previous height, and the ball goes to a height of:0.2222/3 = 0.0741 feet.
Distance traveled by the ball after the fourth bounce = 11.7778 + 0.0741 + 0.0741 = 11.926 feet. Therefore, the total distance traveled by the ball is approximately 11.926 feet.
See more about total distance at: https://brainly.com/question/29409777
#SPJ11
PLEASE HELP FIRST CORRECT WILL GET BRAINLIEST
Answer: Felipe has walked 25.1 meters.
Step-by-step explanation:
Felipe walks the length of his living room, which is 9.1 meters. He then turns and walks the width of his living room, which is 3.5 meters. Finally, he walks back to the corner he started from, which is another 9.1 meters.
The total distance that Felipe has walked is the sum of the distances he covered in each of these three parts of his walk. So, we need to add up 9.1 meters, 3.5 meters, and 9.1 meters to get the total distance.
9.1 m + 3.5 m + 9.1 m = 21.7 m
Therefore, Felipe has walked 21.7 meters so far. However, he still needs to walk back to the corner he started from. This distance is equal to the diagonal of the rectangle formed by his living room.
We can use the Pythagorean theorem to find the length of this diagonal. The length and width of the rectangle are 9.1 meters and 3.5 meters, respectively. Let d be the length of the diagonal, then:
d² = 9.1² + 3.5²
d² = 83.06
d ≈ 9.11 meters
Therefore, the total distance that Felipe has walked is approximately:
21.7 m + 9.11 m ≈ 25.1 m
So, Felipe has walked about 25.1 meters.
Answer:
Felipe has walked 25.2 meters in total.
Step-by-step explanation:
To find out how far Felipe has walked, we need to calculate the perimeter of his living room. The perimeter is the distance around the outside of a shape.
The formula for the perimeter of a rectangle is:
perimeter = 2(length + width)
Given that the length of Felipe's living room is 9.1 meters and the width is 3.5 meters, we can substitute these values into the formula and get:
perimeter = 2(9.1 + 3.5)
perimeter = 2(12.6)
perimeter = 25.2 meters
A barista mixes 12lb of his secret-formula coffee beans with 15lb of another bean that sells for $18 per lb. The resulting mix costs $20 per lb. How much does the barista's secret-forumula means cost per pound?
Answer:
The baristas secret formula beans cost per pound is $19.2.
Step-by-step explanation:
Given is that a barista mixes 12 lb of his secret-formula coffee beans with 15 lb of another bean that sells for $18 per lb.The cost of 1 pound of another bean as -$(15/18) = $(5/6)Assume that 1 pound of secret coffee costs ${x}. So, we can write -x + 5/6 = 20x = 20 - 5/6x = 19.2Therefore, the baristas secret formula beans cost per pound is $19.2.
Answer:
Find 5 rational numbers between 4/5 - and * 3/7
suppose that each day the price of a stock moves up 1/8th of a point with probability 1/3 and moves down 1/8th of point with probability 2/3. if the price fluctuations from one day to another are independent, what is the probability that after 6 days the stock has its original price?
After 6 days, the probability that the stock has its original price is 5/16.
There are two possible scenarios that can take place when the stock price fluctuates from one day to the next. Either the price goes up by 1/8th of a point with probability 1/3 or it goes down by 1/8th of a point with probability 2/3.
The price of the stock after six days can be denoted as S6. The price of the stock after the first day can be represented as S0.
Since the price fluctuates either up or down by 1/8th of a point on each day, the price after six days can be represented as follows:S6 = S0 + (up, up, up, up, up, up), (up, up, up, up, up, down), (up, up, up, up, down, up), ... , (down, down, down, down, down, down)
In order to return to the original price, the stock must go up and down by the same amount. As a result, there must be an equal number of ups and downs in the six-day period.
As a result, we must calculate the probability of obtaining an equal number of ups and downs over six days.
Let's represent an increase in the stock price as 'U' and a decrease as 'D.'
The total number of ways in which the stock can go up and down over six days is [tex]2^6 = 64[/tex].
The total number of ways in which the stock can return to its original price can be calculated as follows: [tex]N(UUUDDD) = 6! / (3! * 3!) = 20[/tex]
The probability of the stock returning to its original price after six days can be calculated as:
[tex]P = N(UUUDDD) / 64 = 20 / 64 = 5 / 16[/tex]
Therefore, the probability that after 6 days the stock has its original price is 5/16.
Learn more about probability here:
https://brainly.com/question/24756209
#SPJ11
Which value will be assigned to z in line 12 under static sexping? (b) Which value will be assigned to 2 in line 12 under dynamic scoping? I might be instructive to draw the runtime stack for different times of the execution. Inut it is not strictly required. Draw the runtime stack after each line executes! Exercise 3. Parameter Passing Consider the following block. Ansune static scaping { int y: int z; - 7 { int (int a) 4 yari: return (yta) 1 int g(int x) { y = f(x+1)+1; 2:- 1( x3): return (z+1) } 2 :- g(y2): : 12 13 14 is) What are the values of y and 2 at the end of the following block under the assumption that both parameters a und x repassed: la) Call-by-Name (h) Calltyy Need It might be instructive to draw the runtime stack for differcut times of the execution, but it is not strictly required Draw the runtime stack after each line executes
The runtime stack for dynamic scoping at the end of the block would be:
Under static scoping, the value of z in line 12 will be 7. Under dynamic scoping, the value of z in line 12 will be the value of y in line 2, which is equal to f(x+1)+1. The values of y and z in the end of the block will differ depending on the parameter passing method used.
For call-by-name, the value of y at the end of the block will be f(x+1)+1 and the value of z will be f(x+1)+1+1. For call-by-need, the value of y will be f(x+1)+1 and the value of z will be f(x+1)+1+1.
It might be instructive to draw the runtime stack for different times of the execution, but it is not strictly required. The runtime stack for static scoping at the end of the block would be:
The runtime stack for dynamic scoping at the end of the block would be:
Does someone mind helping me with this problem? Thank you!
the answer to the problem that you need to is 1024
Don bought the furniture listed below he paid $500 and will make monthly payments of $85 for the remaining amount how long will it take to pay for the furniture
Answer:
it will take approximately 5.88 months for Don to pay off the remaining amount of $R = $85t = $85(5.88) = $499.80
Step-by-step explanation:
Don paid $500 upfront and will make monthly payments of $85 for the remaining amount. Let's assume the remaining amount he needs to pay is $R. The total cost of the furniture is the sum of the amount paid upfront and the remaining amount:
Total Cost = $500 + $R
Since he will be paying $85 per month, we can set up an equation to determine the time it will take to pay off the remaining amount:
$R = $85t
where t is the number of months it will take to pay off the remaining amount.
Substituting $R = $85t in the total cost equation, we get:
Total Cost = $500 + $85t
Since we want to find the time it will take to pay off the furniture, we need to solve for t. We can equate the total cost to the amount Don will pay at the end of the payment period, which is:
Total Cost = Amount Paid
$500 + $85t = $500 + $85t + $R
$85t = $R
$500 + $85t = $500 + $85t + $85t
$500 + $170t = $500 + $R
$170t = $R
Substituting $R = $85t, we get:
$170t = $85t
t = $500/$85
t = 5.88 (rounded to two decimal places)
Joan has a credit limit of $900. Her new balance is $450. What is Joan's available credit?
Hi!
Let's write this out.
Her limit is $900, and she's used $450. So, we subtract 450 from 900.
900-450 = 450.
So, she has $450 available credit left.
Hope this helps!
~~~PicklePoppers~~~
Answer: your credit utilization ratio on that card would be 50% but the answer is 450
Step-by-step explanation:
900-450 = 450
5.6 Enrichment and Extension
Please answer A, B, D, F, H, l, N, and P
Step-by-step explanation:
a. f(x) = s(q(x))
b. f(x) = q(s(q(x)))
d. f(x) = g(p(h(x)))
f. f(x) = q(s(x))
i. f(x) = h(r(x))
n. f(x) = h(g(s(x)))
not sure about h and p tho
hope this helps